GEM/2025/B/6158831 |
APPOINTMENT OF AGENCY FOR CARRYING OUT DETAILED SURVEY WORKS FOR WATER SUPPLY SCHEMES IN BANASKANTHA, PATAN, ARAVALLI DISTRICT OF GUJARAT |
Apr. 23, 2025 |
May. 13, 2025 |
|
GEM/2025/B/6157970 |
Geotechnical Investigation (Core Drilling) for Amba Pumped Storage Project, Maharashtra |
Apr. 22, 2025 |
May. 06, 2025 |
|
WAP/INFRA/KERALA/25/NLBR/504-2 |
CONSTRUCTION OF NEW W&C BLOCK AT DH NILAMBUR, MALAPPURAM -PHASE 2 |
Apr. 22, 2025 |
May. 05, 2025 |
|
WAP/ENVT/AIIA-GOA/SR/PKG-VIII/2025/08 |
SPECIAL REPAIR WORK- CONSTRUCTION OF STORM WATER DRAIN WITH SLAB AND LAYING OF INTERLOCKING TILES AT ALL INDIA INSTITUTE OF AYURVEDA (PACKAGE-8) |
Apr. 21, 2025 |
Apr. 30, 2025 |
|
WAP/ENVT/AIIA-GOA/SR/PKG-IX/2025/09 |
SPECIAL REPAIR- CONSTRUCTION OF TOILET BLOCK INCLUDING COVERING OF DG SET AND CHILLER PLANT WITH SHED AT ALL INDIA INSTITUTE OF AYURVEDA, GOA (PACKAGE-9) |
Apr. 21, 2025 |
Apr. 30, 2025 |
|
WAP/ENVT/AIIA-GOA/SR/PKG-X/2025/10 |
SPECIAL REPAIR WORK- CONSTRUCTION OF SHED IN BALCONY INCLUDING SUPPLY AND FIXING OF GRILL WITH WIRE MESS DOOR AT ALL INDIA INSTITUTE OF AYURVEDA (PACKAGE-10) |
Apr. 21, 2025 |
Apr. 30, 2025 |
|
WAP/ENVT/AIIA-GOA/SR/PKG-XI/2025/11 |
SPECIAL REPAIR- SUPPLY AND FIXING OF GLASS, UPVC WIRE MESH DOOR, UPVC WINDOWS IN RESIDENTIAL AREA AT ALL INDIA INSTITUTE OF AYURVEDA, GOA (PACKAGE-11) |
Apr. 21, 2025 |
Apr. 30, 2025 |
|
WAP/ENVT/AIIA-GOA/SR/PKG-VII/2025/07 |
SPECIAL REPAIR- RENOVATION (CIVIL AND ELECTRICAL ) WORKS AT ALL INDIA INSTITUTE OF AYURVEDA, GOA (PACKAGE-VII) |
Apr. 21, 2025 |
Apr. 30, 2025 |
|
WAP/ENVT/ESIC/SR-ER Kolkata/2025/1 |
Special Repair Works of waterproofing to the terrace of old building (MRI) Portion, Joka, Kolkata |
Apr. 16, 2025 |
Apr. 29, 2025 |
|
WAP/INFRA/KERALA/24/CMGP/494-2 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CENTRALISED MEDICAL GAS SYSTEM AT DISTRICT HOSPITAL CHENGANNUR |
Apr. 11, 2025 |
Apr. 25, 2025 |
|
WAP/ROPEWAYS/2025-26/02 |
DEVELOPMENT OF ECOPARK AT BARKAKANA, DISTT. RAMGARH, JHARKHAND (Call-2) |
Apr. 08, 2025 |
Apr. 29, 2025 |
|
GEM/2025/B/6122172 |
PROCUREMENT OF SATELLITE IMAGERY THROUGH NRSC EMPANELED VENDORS OF 50 CM HIGH RESOLUTION STEREO FRESH SATELLITE IMAGERY 4 BAND IN DIBANG VALLEY DISTRICT OF ARUNACHAL PRADESH STATE APPROX. COVERING WITH AS.200 SQ. KM AND PROCESSING AND PREPARATION OF TOPOGRAPHICAL / CONTOUR MAP |
Apr. 08, 2025 |
Apr. 29, 2025 |
|
GEM/2025/B/6113504 |
Liability Insurance Service |
Apr. 08, 2025 |
Apr. 29, 2025 |
|
GEM/2025/B/6114659 |
“Carrying out the survey work and preparation of report for repair, covering of water courses and constructing lined water courses at unlined reaches for Direct Minors/ Disty. Offtakes between RD 1254 to RD 1458 (T) of IGMN, Shaheed Birbal Branch, Sagarmal Gopa Branch and Baba Ramdev Sub Branch” |
Apr. 05, 2025 |
Apr. 25, 2025 |
|
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-3/19 |
Survey, Investigation, Planning, Designing and Construction of Tower-4 and Tower-5 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-3) |
Apr. 01, 2025 |
Apr. 28, 2025 |
|
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-7/23 |
Survey, Investigation, Planning, Designing and Construction of Tower-12 and Tower-13 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-7) |
Apr. 01, 2025 |
Apr. 28, 2025 |
|
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-6/22 |
Survey, Investigation, Planning, Designing and Construction of Tower-10 and Tower-11 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-6) |
Apr. 01, 2025 |
Apr. 28, 2025 |
|
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-5/21 |
Survey, Investigation, Planning, Designing and Construction of Tower-8 and Tower-9 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-5) |
Apr. 01, 2025 |
Apr. 28, 2025 |
|
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-1/17 |
Survey, Investigation, Planning, Designing and Construction of Tower -1 and other works at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package no.: NITP-1) |
Apr. 01, 2025 |
Apr. 28, 2025 |
|
WAP/CMU-III/2024-25/NSIC/Delhi/16 |
UPGRADATION OF BOUNDARY WALL AT NSIC TECHNICAL SERVICES CENTRE (NTSC), OKHLA AND RAISING HEIGHT OF BOUNDARY WALL AROUND ZONAL GREEN AREA FALLING IN NSIC COMPLEX AT OKHLA, NEW DELHI. |
Mar. 28, 2025 |
Apr. 25, 2025 |
|
GEM/2025/B/6022124 |
Hiring of Agency for carrying out conversion of Khasra into Murabba & preparation of schedule - 04 & 08 for Choudhary Kumbha Ram Arya Lift Canal (Sahwa Lift Canal) of IGNP Stage- II |
Mar. 05, 2025 |
May. 01, 2025 |
|
WAP/ROPEWAYS/2024-25/12 |
RENOVATION OF ADMIN BLOCK AND REDEVELOPMENT OF RECEPTION BUILDING, MAIN GATE AND SECURITY OFFICE AT MTPF AMBERNATH, MAHARASHTRA |
Mar. 01, 2025 |
May. 02, 2025 |
|
WAP/ROPEWAYS/2024-25/09 |
REPAIR AND RENOVATION OF MAIN WORKSHOP AT MTPF AMBERNATH, MAHARASHTRA |
Feb. 25, 2025 |
Apr. 29, 2025 |
|