Loading...

संग्रहित निविदा

निविदा संख्या निविदा का नाम प्रकाशन तिथि अंतिम तिथि दस्तावेज़
WAP/INFRA/KERALA/24/CMGP/494-2 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CENTRALISED MEDICAL GAS SYSTEM AT DISTRICT HOSPITAL CHENGANNUR April 11, 2025, midnight April 25, 2025, midnight
GEM/2025/B/6122441 Hiring of Agency for Providing Services for Rendering Technical & Logistic Support for the Development of Sports Infrastructure in Mandrem, Goa (2nd Call) April 8, 2025, midnight April 18, 2025, midnight
GEM/2025/B/6114659 “Carrying out the survey work and preparation of report for repair, covering of water courses and constructing lined water courses at unlined reaches for Direct Minors/ Disty. Offtakes between RD 1254 to RD 1458 (T) of IGMN, Shaheed Birbal Branch, Sagarmal Gopa Branch and Baba Ramdev Sub Branch” April 5, 2025, midnight April 25, 2025, midnight
GEM/2025/B/6112257 Liability Insurance Service - Professional Liability Insurance Policy for Consultancy Services for Preparation of Feasibility Report of Emini Amulin Mihumdon HEPs in Arunachal Pradesh for a period of 1 year April 4, 2025, midnight April 15, 2025, midnight
GEM/2025/B/6111142 Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Outstation April 4, 2025, midnight April 15, 2025, midnight
WAP/PO/PKL/YSS/01 CONSTRUCTION OF INDOOR SPORTS STADIUM AT CHAMBA, HIMACHAL PRADESH April 3, 2025, midnight April 23, 2025, midnight
WAP/ENVT/SSP/BASEMENT/2025/01 CONSTRUCTION & UPGRADATION OF LOWER GROUND FLOOR IN CIF AND CB BUILDING AT NATIONAL INSTITUTE OF PHARMACETUICAL EDUCATION AND RESEARCH (NIPER)- GUJARAT April 2, 2025, midnight April 21, 2025, midnight
WAP/ENVT/SSP/COE/2025/02 CONSTRUCTION OF CENTRE FOR EXCELLENCE - MEDICAL DEVICES AT NATIONAL INSTITUTE OF PHARMACETUICAL EDUCATION AND RESEARCH (NIPER-A) - GUJARAT April 2, 2025, midnight April 21, 2025, midnight
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-2/18 Survey, Investigation, Planning, Designing and Construction of Tower-2 and Tower-3 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-2) April 1, 2025, midnight April 19, 2025, midnight
WAP/CMU-III/2024-25/SMFPL/Agartala/NITP-4/20 Survey, Investigation, Planning, Designing and Construction of Tower-6 and Tower-7 at National Industrial Township at Agartala, Tripura on EPC Mode-I (Package No.: NITP-4) April 1, 2025, midnight April 19, 2025, midnight
WAP/INFRA/KERALA/2025/KUB/508 Construction of Accomadation complex(Gents Hostel,Ladies Hostel & Residential complex) ,Karyavattom Campus ,Trivandrum April 1, 2025, midnight April 19, 2025, midnight
WAP/INFRA/KERALA/2025/KUA/507 Construction of Multi Storied Building Facilitate Academic activities(Academic Complex, Translational Research Laboratory and Academic Incubator Centre) at Karyavattom Campus,Trivandrum April 1, 2025, midnight April 19, 2025, midnight
WAP/INFRA/KERALA/25/VLYL/502-1 CONSTRUCTION OF BUILDING FOR VELLAYIL POLICE STATION AT KOZHIKODE CITY March 29, 2025, midnight April 19, 2025, midnight
WAP/INFRA/KERALA/25/BYPR/501-1 CONSTRUCTION OF BUILDING FOR BEYPORE POLICE STATION AT KOZHIKODE CITY March 29, 2025, midnight April 19, 2025, midnight
WAP/INFRA/KERALA/25/NLBR/504-1 CONSTRUCTION OF NEW W&C BLOCK AT DH NILAMBUR, MALAPPURAM -PHASE 2 March 29, 2025, midnight April 19, 2025, midnight
GEM/2025/B/6094217 Actuarial valuation of Trade receivables/ Retention money / Security Deposits etc. for providing ECL for the Nine months ending December , 2024 March 28, 2025, midnight April 7, 2025, midnight
WAP/CMU-III/2024-25/NSIC/Delhi/16 UPGRADATION OF BOUNDARY WALL AT NSIC TECHNICAL SERVICES CENTRE (NTSC), OKHLA AND RAISING HEIGHT OF BOUNDARY WALL AROUND ZONAL GREEN AREA FALLING IN NSIC COMPLEX AT OKHLA, NEW DELHI. March 28, 2025, midnight April 25, 2025, midnight
GEM/2025/B/6087092 Selection of Agency for Waste Water Quality Test for preparation of DPR with Master Plan of a Comprehensive Storm Water Drainage Scheme of Howrah Municipality Corporation (HMC) March 28, 2025, midnight April 4, 2025, midnight
GEM/2025/B/6089751 Tender Document for Appointment of agency for conducting topographical survey for Master Water Supply Scheme for Faridabad town March 28, 2025, midnight April 17, 2025, midnight
WAP/ENVT/GNFSU/2024-25/03 CONSTRUCTION FOR GUJARAT NATURAL FARMING SCIENCE UNIVERSITY, AT JAMBUDI VILLAGE, TALUKA HALOL, PANCHMAHAL DISTRICT (E+D1 TYPE QUARTER, E2+E1 TYPE QUARTER, UG GIRLS HOSTEL, UG BOYS HOSTEL, FARM STRUCTURE, GAU SHALA, COMPOUND WALL & WATCHMAN CABIN AT GIRLS HOSTEL, POSITIVE MILLET LAB, BIO INPUT LAB, WBM APPROACH ROAD, WATER SUPPLY AND 6.0LAC. LITER ESR AND FURNITURE WORK AT HALOL) March 27, 2025, midnight April 17, 2025, midnight
WAP/INFS-1/IIMM/R&M/2025/04 Special Repair works in Savitribai Phule Girls Hostel, Swami Vivekananda Hall Boys hostel, Children’s Park and Modular Fencing Work in Anand Vihar in IIM Mumbai March 26, 2025, midnight April 5, 2025, midnight
WAP/ENVT/SPG-ARMO/2025/01 ANNUAL REPAIR & MAINTENANCE OF CIVIL, ELECTRICAL AND HORTICULTURE WORK AND OPERATION & MAINTENANCE OF EQUIPMENT AND MACHINERIES OF SPG COMPLEX, SECTOR-21, DWARKA March 25, 2025, midnight April 1, 2025, midnight
GEM/2025/B/6080216 GEOTECHNICAL INVESTIGATION (CORE DRILLING) FOR AMBA PUMPED STORAGE PROJECT, MAHARASHTRA March 24, 2025, midnight April 5, 2025, midnight
GEM/2025/B/5888782 Liability Insurance Service - Professional liability Insurance policy for Hiring of Consultant for Selection of Most Suitable PSP out of Four PSPs in Bihar Preparation of Feasibility Report for a period of 1 year March 24, 2025, midnight April 4, 2025, midnight
GEM/2025/B/5879433 Autocad - Single User Annual Subscription , Autocad LT - Single User Annual Subscription , Autodesk Architecture, Engineering & Construction Collection - Single User Annual Subscription , Civil 3D - Single User Annual Subscription , Infraworks - Single User Annual Subscription , Navisworks - Single User Annual Subscription , Navisworks Manage - Single User Annual Subscription , Revit - Single User Annual Subscription March 21, 2025, midnight April 10, 2025, midnight
WAP/ENVT/SSP/ESR/2025/02 ENGINEERING PROCURMENT & CONSTRUCTION OF 1 NO. OF 1.5 LAKH LITER OVERHEAD WATER TANK & OTHER INFRASTRUCTURE WORKS AT SPORTS AUTHORITY OF INDIA, GANDHINAGAR CAMPUS, GUJARAT March 18, 2025, midnight April 4, 2025, midnight
WAP/INFRA/KERALA/24/TSM/480-4 Engineering, Procurement and Construction (EPC) Contractor for Development of Kovalam & Adjacent beaches in Thiruvananthapuram, Kerala March 17, 2025, midnight April 7, 2025, midnight
WAP/ENVT/ESIC-ARMO/BADDI/2025/01 ANNUAL REPAIR, MAINTENANCE & OPERATION (ARMO) WORKS OF CIVIL & ELECTRICAL IN ESIC MODEL HOSPITAL BADDI, HIMACHAL PRADESH March 15, 2025, midnight March 25, 2025, midnight
WAP/ENVT/PGICH/SR-HVAC&FF/PKG-13/2024/13 SPECIAL REPAIR WORKS: REPLACEMENT OF CHILLER PLANT, PUMPS, SITC OF FCUS, FIRE FIGHTING WORK AND MINOR ELECTRICAL WORK AT PGICH, SECTOR 30 NOIDA (PACKAGE-13) March 13, 2025, midnight March 20, 2025, midnight
WAP/ENVT/AIIA-GOA/SR/PKG-VI/2025/06 SPECIAL REPAIR WORK- REPLACEMENT & INSTALLATION OF NEW AHU IN HOSPITAL OT, GF AREA AT AIIA GOA (PACKAGE-6) March 7, 2025, midnight March 17, 2025, midnight
WAP/ROPEWAYS/2024-25/13 DEVELOPMENT OF ECOPARK AT BARKAKANA, DISTT. RAMGARH, JHARKHAND. March 7, 2025, midnight March 24, 2025, midnight
GEM/2025/B/6022417 Carrying Out The Survey Work And Preparation Of Report For Repair, Covering Of Water Courses And Constructing Lined Water Courses At Unlined Reaches For Direct Minors/ Disty. Offtakes Between RD 1254 to RD 1458 (T) of IGMN, Shaheed Birbal Branch, Sagarmal Gopa Branch and Baba Ramdev Sub Branch (2nd Call) March 5, 2025, midnight March 25, 2025, midnight
GEM/2025/B/6026600 Engagement of Human Resource (HR) Consultant for Policy Integration and Development of a Post-Merger HR Plan for WAPCOS & NPCC March 5, 2025, midnight March 29, 2025, midnight
GEM/2025/B/6020486 Architectural Services for Construction of Steel Structure Building along with issuance of fabrication drawings for CBSE RO & COE Building at Sector 33A Noida, UP March 4, 2025, midnight March 14, 2025, midnight
GEM/2025/B/6008085 Geotechnical Investigation (Core Drilling) for Sikaser Pumped Storage Project (1200 MW), Gariaband district, Chhattisgarh March 3, 2025, midnight March 21, 2025, midnight
WAP/ENVT/PGICH/SR-E&M/PKG-12/2024/12 SPECIAL REPAIR WORKS: SITC OF HVAC SYSTEMS, INTERNAL ELECTRIFICATION AND FIRE FIGHTING WORK IN TOWER 9 AT PGICH, NOIDA (PACKAGE-12) March 3, 2025, midnight March 10, 2025, midnight
GEM/2025/B/5994902 Architectural Services for Preparation of Feasibility Report for implementation of Ropeways in Indore (Call 2) March 1, 2025, midnight March 21, 2025, midnight
WAP/ROPEWAYS/2024-25/11 RENOVATION OF WATER SUPPLY NETWORK WITH PROVISION OF UGR TANK & TUBE WELL AT MTPF AMBERNATH, MAHARASHTRA March 1, 2025, midnight April 3, 2025, midnight
WAP/CMU-III/2024-25/ NESTS /TN/YERCAUD/15 Construction of Eklavya Model Residential School (EMRS) at Yercaud, District Salem, Tamil Nadu March 1, 2025, midnight March 15, 2025, midnight
GEM/2025/B/6002584 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for the works of Development of the Parbatsar and Pindwara in Rajasthan Feb. 28, 2025, midnight March 13, 2025, midnight
WAP/ENVT/ESIC-ARMO/ODISHA /2025/Pkg-5/05 ANNUAL REPAIRS, MAINTENANCE & OPERATION WORKS CIVIL ON LUMP SUM SERVICE CHARGES ON DEPOSIT WORK FOR MODEL HOSPITAL, ROURKELA (PKG-5) Feb. 27, 2025, midnight March 10, 2025, midnight
WAP/ENVT/ESIC-ARMO/ODISHA /2025/Pkg-6/06 ANNUAL REPAIRS, MAINTENANCE & OPERATION WORKS ( ELECTRICAL) ON LUMP SUM SERVICE CHARGES ON DEPOSIT WORK FOR MODEL HOSPITAL, RAURKELA (PACKAGE-6) Feb. 27, 2025, midnight March 10, 2025, midnight
WAP/POW/T&DS&S/NIT/TOGO/AT2ER/2025/01 NOTICE INVITING TENDER FOR SELECTION OF LOCAL AGENCY FOR CARRYING OUT ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY/ FIELD WORK AND PREPARATION OF ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT REPORT AND ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN FOR RURAL ELECTRIFICATION OF 350 VILLAGES IN TOGO THROUGH SOLAR PHOTOVOLTAIC SYSTEMS (EXIM BANK FUNDED)”. Feb. 27, 2025, midnight March 13, 2025, midnight
WAP/ROPEWAYS/2024-25/10 RENOVATION OF EXISTING STROM WATER DRAIN NETWORK & PROVISION OF STP WITH SEWERAGE NETWORK AT MTPF AMBERNATH, MAHARASHTRA Feb. 25, 2025, midnight April 8, 2025, midnight
WAP/CMU-I/2024-25/ CBSE/NOIDA/08 Construction of CBSE Regional office and Center of Excellence Steel Structure Framed Building at Sector 33, Noida (UP) Feb. 25, 2025, midnight March 24, 2025, midnight
WAP/INFRA/KERALA/24/CELV/495-1 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELV COMPONENTS AT DISTRICT HOSPITAL CHENGANNUR Feb. 25, 2025, midnight April 1, 2025, midnight
WAP/INFRA/KERALA/24/CMGP/494-1 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CENTRALISED MEDICAL GAS SYSTEM AT DISTRICT HOSPITAL CHENGANNUR Feb. 24, 2025, midnight March 8, 2025, midnight
WAP/INFRA/KERALA/2025/TRUV/505 ESTABLISHING TRANSLATIONAL RESEARCH CENTRE FOR THE UNIVERSITY CAMPUS AT VILAPPILSALA Feb. 24, 2025, midnight March 29, 2025, midnight
WAP/ENVT/PGICH/SR-Elec./PKG-11/2024/11 SPECIAL REPAIR WORKS: SUPPLY, INSTALLATION AND REPAIRING OF VARIOUS E&M MODALITIES AT PGICH, SECTOR 30 NOIDA (PACKAGE-11) Feb. 24, 2025, midnight Feb. 28, 2025, midnight
GEM/2025/B/5981161 Engagement of a firm for manual preparation , checking and finalization of data and IND as standalone & consolidated Financial statements of WAPCOS LIMITED Feb. 21, 2025, midnight March 3, 2025, midnight
GEM/2025/B/5984128 Selection of Agency for “The assessment, recognition, and certification as a Great Place to Work” Feb. 21, 2025, midnight March 22, 2025, midnight
WAP/INFRA/KERALA/2025/KLSY/503 CONSTRUCTION OF CRITICAL CARE BUILDING AT GMC KALAMASSERY, ERNAKULAM- PHASE 2 Feb. 19, 2025, midnight March 25, 2025, midnight
WAP/INFRA/KERALA/2025/BYPR/501 CONSTRUCTION OF BUILDING FOR BEYPORE POLICE STATION AT KOZHIKODE CITY Feb. 19, 2025, midnight March 24, 2025, midnight
WAP/INFRA/KERALA/24/EMTY/497-1 CONVERSION OF CHC TO BLOCK FHC AT ERUMAPETTY THRISSUR DISTRICT Feb. 19, 2025, midnight March 25, 2025, midnight
WAP/INFRA/KERALA/2025/VLYL/502 CONSTRUCTION OF BUILDING FOR VELLAYIL POLICE STATION AT KOZHIKODE CITY Feb. 19, 2025, midnight March 24, 2025, midnight
WAP/INFRA/KERALA/2025/NLBR/504 CONSTRUCTION OF NEW W&C BLOCK AT DH NILAMBUR, MALAPPURAM -PHASE 2 Feb. 19, 2025, midnight March 26, 2025, midnight
GEM/2025/B/5963775 Carrying out Geotechnical Investigations (Subsurface) for the for the Barrage Projects in Puducherry Region Feb. 18, 2025, midnight March 17, 2025, midnight
GEM/2025/B/5953527 Carrying out Topographical Survey using Drone LiDAR System & Hydrographic Survey for the Barrage Projects in Puducherry Region Feb. 14, 2025, midnight March 15, 2025, midnight
WAP/ GWRD&M/ DRILLING-DWLR/2024-25/ FMDA/Feb-25/1 DRILLING, CONSTRUCTION OF APPROX. 138 NOS. PIEZOMETERS WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 138 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) ALONG WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 43 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) IN EXISTING PIEZOMETERS UNDER FMDA AREA Feb. 13, 2025, midnight March 17, 2025, midnight
GEM/2025/B/5943453 Hiring of Agency for providing assistance in Preparation of Project Report for the Development of Ajmer & Bharatpur Bus Stands on BOT Model Feb. 13, 2025, midnight Feb. 26, 2025, midnight
WAP/WR/TNA/GEOTECH/2025 Appointment of Agency for Conducting Geotechnical Investigations for Pise weir Project on River Bhatsa, Bhiwandi, Thane, Maharashtra (2nd Call) Feb. 13, 2025, midnight March 5, 2025, midnight
WAP/ GWRD&M/ DRILLING-DWLR/2024-25/GMDA/Feb-25/1 DRILLING, CONSTRUCTION OF APPROX. 134 NOS. PIEZOMETERS WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 134 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) ALONG WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 49 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) IN EXISTING PIEZOMETERS UNDER GMDA AREA Feb. 13, 2025, midnight March 17, 2025, midnight
GEM/2025/B/5942591 GEOTECHNICAL INVESTIGATIONS (SUBSURFACE) FOR THE WORK OF DPR FOR EXCAVATION OF BYE PASS CHANNEL FROM NANGUNERIANKAL TO FEED 46 TANKS BELOW NANGUNERI BIG TANK INCLUDING WIDENING OF NANGUNERI CANAL IN NANGUNERI TALUK IN TIRUNELVELI DISTRICT Feb. 12, 2025, midnight March 5, 2025, midnight
GEM/2025/B/5925727 ESTABLISHMENT OF SURVEY CONTROL POINTS AND CARRYING OUT TOPOGRAPHIC SURVEY USING DRONE WITH LIDAR TECHNIQUE FOR KUMBHE PUMPED STORAGE PROJECT, MAHARASHTRA Feb. 12, 2025, midnight Feb. 21, 2025, midnight
WAP/WR/TNA/2025 Appointment of Agency for carrying out topographical survey for Water Supply / Sewerage Schemes in Maharashtra State” (2nd Call) Feb. 11, 2025, midnight Feb. 27, 2025, midnight
GEM/2025/B/5923062 Survey and Fixing of Blocks & Murabba Stone for the “Work of carrying out conversion of Khasra in to Murabba & preparation of schedule – 04 & 08 and Re- organization of chak plan for G.J.L.C. (Phalodi Lift Canal) of IGNP Stage – II Feb. 7, 2025, midnight March 17, 2025, midnight
WAP/CMU-III/2024-25/ NESTS /TN/YERCAUD/14 Construction of Eklavya Model Residential School at Yercaud, District Salem, Tamil Nadu Feb. 4, 2025, midnight Feb. 25, 2025, midnight
GEM/2025/B/5892484 Appointment of agency for carrying out survey work for supplying water at various villages tank by pipeline from dindrol to mukteshwar pipeline project and dantiwada dam to sipu dam canal link project of patan and banaskantha district Jan. 31, 2025, midnight Feb. 17, 2025, midnight
GEM/2025/B/5893476 APPOINTMENT OF AGENCY FOR CARRYING OUT SURVEY AND GEOTECHNICAL INVESTIGATION WORKS FOR KACHCHH BRANCH CANAL REACH 82.300 KM TO 133.519 KM Jan. 31, 2025, midnight Feb. 14, 2025, midnight
GEM/2025/B/5893249 APPOINTMENT OF AGENCY FOR CARRYING OUT FIELD ALIGNMENT SURVEY OF OPEN DISTRIBUTARIES AND MINORS WITH VILLAGE TANK/DRAIN. Jan. 31, 2025, midnight Feb. 14, 2025, midnight
GEM/2025/B/5892933 APPOINTMENT OF AGENCY FOR GEOTECHNICAL INVESTIGATION WORK FOR SUPPLYING WATER AT VARIOUS VILLAGES TANK BY PIPELINE FROM DINDROL TO MUKTESHWAR PIPELINE PROJECT AND DANTIWADA DAM TO SIPU DAM CANAL LINK PROJECT OF PATAN AND BANASKANTHA DISTRICT. Jan. 31, 2025, midnight Feb. 14, 2025, midnight
GEM/2025/B/5854548 Workmen's Compensation Policy For WAPCOS LTD Jan. 30, 2025, midnight Feb. 10, 2025, midnight
WAP/CMU-II/NIA/2025/10 CONSTRUCTION OF HOSPITAL AT JAMWA RAMGARH, JAIPUR Jan. 29, 2025, midnight Feb. 18, 2025, midnight
WAP/INFRA/KERALA/2025/SANA/500 CONSTRUCTION OF OP & IP BLOCK AT TH SANTHIVILA THIRUVANANTHAPURAM Jan. 29, 2025, midnight Feb. 19, 2025, midnight
WAP/CMU-II/NIA/2025/08 1. Renovation of Academic Block (Window replacement work) at NIA Jaipur 2. Renovation of DW for Girl Hostel at NIA Jaipur Jan. 29, 2025, midnight Feb. 18, 2025, midnight
WAP/CMU-II/NIA/2025/09 1. Construction of Amphitheater at Jagga Ki Bawari, NIA Jaipur 2. Construction of Gazebo at NIA, Jagga Ki Bawari, Jaipur 3. Construction of Watch Tower at NIA, Jagga Ki Bawari, Jaipur Jan. 29, 2025, midnight Feb. 18, 2025, midnight
WAP/CMU-II/NIA/2025/07 1. Construction of Basketball Court at NIA, Jaipur 2. Wooden Paneling, Repair/Renovation and Sound System works for Examination Hall and Seminar Hall at NIA, Jaipur 3. Installation of 15 Pax Lift at NIA, Jaipur 4. Construction of Water Fountain at NIA Jaipur Jan. 29, 2025, midnight Feb. 18, 2025, midnight
GEM/2025/B/5873288 Carrying out the survey work and preparation of report for repair, covering of water courses and constructing lined water courses at unlined reaches for Direct Minors/ Disty. Offtakes between RD 1254 to RD 1458 (T) of IGMN, Shaheed Birbal Branch, Sagarmal Gopa Branch and Baba Ramdev Sub Branch Jan. 27, 2025, midnight Feb. 21, 2025, midnight
WAP/INFS-1/IIMM/R&M/2025/03 Construction of G+1 Executive Dining Hall Near MDP Hostel Building, Interior Renovation & Furnishing Works for Kitchen in Pragati Vihar Building and Furniture work including Interior Alterations Within MDP Hostel Building and setting up of Industrial Kitchen in Pragati Vihar and Swami Vivekanada Hall. Jan. 24, 2025, midnight Feb. 6, 2025, midnight
GEM/2025/B/5859735 PROJECT MANAGEMENT CONSULTANCY SERVICES FOR DEVELOPMENT OF NATIONAL INDUSTRIAL TOWNSHIP PROJECT AT AGARTALA,TRIPURA Jan. 23, 2025, midnight Feb. 13, 2025, midnight
GEM/2025/B/5853711 ESTABLISHMENT OF SURVEY CONTROL POINTS AND CARRYING OUT TOPOGRAPHIC SURVEY USING DRONE WITH LIDAR TECHNIQUE FOR AMBA PUMPED STORAGE PROJECT, MAHARASHTRA Jan. 23, 2025, midnight Feb. 5, 2025, midnight
GEM/2025/B/5854498 Hiring of Agency for carrying out - Geo-technical Investigation for MBRAPP -1 to 4 Jan. 23, 2025, midnight Feb. 12, 2025, midnight
WAP/CMU-III/2024-25/ BSF/TEKANPUR/12 UPGRADATION/IMPROVEMENT OF LAXMI BAI PARADE GROUND AT BSF ACADEMY TEKANPUR Jan. 21, 2025, midnight Feb. 17, 2025, midnight
GEM/2025/B/5825196 ARCHITECTURAL CONSULTANCY FOR CONSTRUCTION OF ROPE CAR ARULMIGU VEDAGIREESWARA TEMPLE, THIRUKALKUNDRAM DIST., TAMILNADU (Call 2) Jan. 21, 2025, midnight Jan. 29, 2025, midnight
GEM/2025/B/5825280 ARCHITECTURAL CONSULTANCY FOR CONSTRUCTION OF ROPE CAR - ARULMIGU RANGANATHA PERUMAL TEMPLE, THIRUNEERMALAI, PALLAVARAM, DISTRICT, CHENGALPET (Call 2) Jan. 21, 2025, midnight Jan. 29, 2025, midnight
WAP/IIM/New Works/RfQ/01 Shortlisting of the Contractors for Engineering, Procurement and Construction for Development of Indian Institute of Management Mumbai, Vihar Lake Road, Powai, Mumbai Jan. 21, 2025, midnight March 5, 2025, midnight
GEM/2025/B/5833266 SUPPLY & INSTALLATION OF FURNITURE FOR CONSTRUCTION OF EKLAVYA MODEL RESIDENTIAL SCHOOL (EMRS) MANPUR, DISTRICT RAJNANDGAON AT CHHATTISGARH Jan. 17, 2025, midnight Jan. 31, 2025, midnight
GEM/2025/B/5829736 Providing Consultancy Services for Market Assessment, Financial Analysis, Advertisement, Marketing and Sales Services of Built-up area of Development of National Industrial Township Project at Agartala, Tripura Jan. 17, 2025, midnight Feb. 11, 2025, midnight
WAP/Environment/Lab/Water and soil quality/2024/R1 Empanelment of NABL Accredited Laboratory for Water and Soil Quality Analysis for various Projects in India Jan. 16, 2025, midnight Jan. 31, 2025, midnight
WAP/INFRA/KERALA/24/TSM/480-3 Engineering, Procurement and Construction (EPC) Contractor for Development of Kovalam & Adjacent beaches in Thiruvananthapuram, Kerala Jan. 16, 2025, midnight Jan. 30, 2025, midnight
WAP/ENVT/AIIA-GOA/SR/PKG-V/2024/05 ESTABLISHMENT OF VLAN AND FIREWALL SETUP AND PROVIDING AND FIXING OF CCTV CAMERA INSTALLATIONS ALONG WITH ACCESSORIES AT ALL INDIA INSTITUTE OF AYURVEDA, GOA (PACKAGE-V) Jan. 15, 2025, midnight Jan. 29, 2025, midnight
WAP/ENVT/ESIC/SR-KANPUR/2025/02 SPECIAL REPAIR AND MAINTENANCE (CIVIL) OF HOSPITAL BUILDING LIKE FIXING OF FLOOR TILES, UPVC WINDOWS, EXTERNAL PLASTER AND PAINTING ETC. OF HOSPITAL BUILDING FOR ESIC HOSPITAL, JAJMAU,KANPUR (PACKAGE-2) Jan. 15, 2025, midnight Jan. 29, 2025, midnight
WAP/ENVT/SSP/TEMPORARY SHED/2025/01 CONSTRUCTION OF 1 NO. OF TEMPORARY SHED AT SPORTS AUTHORITY OF INDIA, GANDHINAGAR CAMPUS, GUJARAT Jan. 14, 2025, midnight Jan. 27, 2025, midnight
WAP/INFS-I/2024-25/12 Firefighting Work/Fire Protection System with related allied works in Various Buildings at Permanent Campus of Central University of Jharkhand at Cheri Mantau, Ranchi, Jharkhand Jan. 14, 2025, midnight Feb. 17, 2025, midnight
GEM/2025/B/5805863 Comprehensive Architectural Services for Construction of Steel Structure Building along with issuance of fabrication drawings for CBSE RO & COE Building at Sector 33A Noida, UP Jan. 10, 2025, midnight Jan. 27, 2025, midnight
GEM/2025/B/5800613 SELECTION OF AGENCY FOR “ESTABLISHMENT OF GROUND CONTROL POINTS (GCPs), CONNECT GCPs NETWORK ALONG WITH VALIDATION OF TOPOGRAPHICAL SURVEY WITH CONTOUR PLAN MAP WITH UTM COORDINATES” FOR EMINI, AMULIN AND MIHUMDON HEP’S IN ARUNACHAL PRADESH Jan. 9, 2025, midnight Jan. 20, 2025, midnight
GEM/2025/B/5800755 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for the work for Diversion of surplus flood water of RPS Dam & water of proposed Brahamani Dam near Shripura village, Rawatbhata Tehsil of District Chittorgarh to Bisalpur Dam for flood management of Chambal River Jan. 9, 2025, midnight Feb. 10, 2025, midnight
GEM/2025/B/5776946 Third Party Liability Insurance Policy for Hiring of Consultant for Selection of Most Suitable PSP out of Four PSPs in Bihar Preparation of Feasibility Report for a period of 6 months Jan. 9, 2025, midnight Jan. 23, 2025, midnight
GEM/2025/B/5792256 Carrying out Geotechnical Investigations (Subsurface) for the proposed Koyna Tail Water Utilization Project Jan. 8, 2025, midnight Jan. 21, 2025, midnight
GEM/2025/B/5792107 Carrying out Topographical Survey using Aerial LiDAR System for the proposed Koyna Water Utilization Project Jan. 8, 2025, midnight Feb. 1, 2025, midnight
GEM/2025/B/5794021 CARRYING OUT TOPOGRAPHIC AND HYDROGRAPHIC SURVEY FOR UPDATION OF DETAILED PROJECT REPORT (DPR) OF NATIONAL WATERWAY (NW) – 5 Jan. 8, 2025, midnight Jan. 22, 2025, midnight
GEM/2024/B/5767444 To Carry Out Feasibility Studies for Analysis of the Connectivity Option for Oil Jetty No.8 To 11 With Y- Junction (Via Oil Jetty No.7) at Kandla Dec. 31, 2024, midnight Jan. 16, 2025, midnight
GEM/2024/B/5746274 CONSULTANCY SERVICES FOR PREPARATION OF DPR, DETAILED STRUCTURAL DESIGNS, AND DRAWINGS FOR THE CONSTRUCTION OF OPD COMPLEX Dec. 26, 2024, midnight Jan. 14, 2025, midnight
GEM/2024/B/5747106 Hiring of Agency for Providing Technical Manpower in the State of Uttar Pradesh Dec. 26, 2024, midnight Jan. 9, 2025, midnight
GEM/2024/B/5734008 Appointment of Agency for Conducting Third Party Inspection for various Infrastructure works in Delhi Dec. 20, 2024, midnight Jan. 10, 2025, midnight
WAP/ENVT/ESIC/SR-KANPUR/2024/01 SPECIAL REPAIR OF FIRE FIGHTING AND OBTAINING FIRE NOC OF HOSPITAL BUILDING FOR ESIC HOSPITAL, JAJMAU, KANPUR-UTTAR PRADESH (PACKAGE-1) Dec. 20, 2024, midnight Dec. 31, 2024, midnight
GEM/2024/B/5718364 Selection of Agency for Quality Testing, Control & Assurance work for Projects of SSEPD Deptt. of Government of Odisha Dec. 18, 2024, midnight Dec. 27, 2024, midnight
WAP/ENVT/PGICH/SR-Elec./PKG-10/2024/10 SPECIAL REPAIR WORKS: INTERNAL ELECTRIFICATION WORK IN TOWER 9 AT PGICH, SECTOR 30 NOIDA (PACKAGE-10) Dec. 17, 2024, midnight Dec. 27, 2024, midnight
WAP/RAJASTHAN/DPR/2024/01 Hiring of Agency for providing assistance in Preparation of Detailed Project Report for the Development of Ajmer & Bharatpur Bus Stands on BOT Model Dec. 17, 2024, midnight Dec. 30, 2024, midnight
WAP/Environment/Lab/Air Quality Monitoring /2024 Empanelment of NABL Accredited Laboratory for Ambient Air Quality Monitoring for various Projects in India Dec. 17, 2024, midnight Jan. 1, 2025, midnight
WAP/ENVT/ESIC/SR-ROHINI/PKG-6/2024/06 SPECIAL REPAIR WORK- RENOVATION WORK AT 2ND FLOOR ADMINISTRATIVE BLOCK & SUPPLYING AND INSTALLATION OF STREET LIGHT IN SEC-15, ESIH ROHINI, NEW DELHI (PACKAGE-6) Dec. 16, 2024, midnight Dec. 30, 2024, midnight
WAP/INFRA/KERALA/2024/KZRY/499 CONSTRUCTION OF NEW BUILDING DTC KOZHENCHERY AT PATHANAMTHITTA DISTRICT Dec. 13, 2024, midnight Dec. 26, 2024, midnight
GEM/2024/B/5691680 Procurement of Satellite Imagery through NRSC empanelled vendors of 50 CM High Resolution Stereo Fresh Satellite Imagery 4 Band In Dibang Valley District of Arunachal Pradesh State Approx. Covering With As 200 Sq. Km And Processing And Preparation of Topographical / Contour Map Dec. 11, 2024, midnight Jan. 2, 2025, midnight
GEM/2024/B/5682076 Carrying out Geotechnical Investigations (Subsurface) for the proposed Koyna Tail Water Utilization Project Dec. 10, 2024, midnight Jan. 2, 2025, midnight
WAP/(INFS-III)/IP-Div./BBSR/SSEPD/TPQ/2024 Selection of Agency for Quality Testing, Control & Assurance work for Projects of SSEPD Deptt. of Government of Odisha Dec. 10, 2024, midnight Dec. 23, 2024, midnight
GEM/2024/B/5676622 Appointment of Agency for Conducting Geotechnical Investigations for Pise weir Project on River Bhatsa, Bhiwandi, Thane, Maharashtra Dec. 9, 2024, midnight Dec. 17, 2024, midnight
GEM/2024/B/5671811 Hiring of Agency for Detailed Baseline Survey under Pradhan Mantri Krishi Sinchayi Yojna (PMKSY-HKKP-SMI) being implemented by Minor Irrigation Department in the State of Uttarakhand. Dec. 9, 2024, midnight Dec. 20, 2024, midnight
WAP/PHIW/TRAFFIC/NW5/2024 CARRYING OUT TRAFFIC SURVEY FOR UPDATION OF DETAILED PROJECT REPORT (DPR) OF NATIONAL WATERWAY (NW) – 5 Dec. 9, 2024, midnight Dec. 23, 2024, midnight
WAP/INFRA/KERALA/2024/KOTH/498 CONSTRUCTION OF KOOTHUPARAMBA TOWN HALL (PHASE-3) Dec. 6, 2024, midnight Dec. 20, 2024, midnight
WAP/INFRA/KERALA/2024/EMTY/497 CONVERSION OF CHC TO BLOCK FHC AT ERUMAPETTY THRISSUR DISTRICT Dec. 5, 2024, midnight Dec. 19, 2024, midnight
WAP/INFRA/KERALA/2024/UNCW/496 DEVELOPMENT OF AYURVEDA COLLEGE, UDUMBANCHOLA - COMPOUND WALL – PHASE 1 Dec. 5, 2024, midnight Dec. 17, 2024, midnight
WAP/INFRA/KERALA/2024/CMGP/494 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CENTRALISED MEDICAL GAS SYSTEM AT DISTRICT HOSPITAL CHENGANNUR Dec. 5, 2024, midnight Dec. 23, 2024, midnight
WAP/INFRA/KERALA/2024/CELV/495 SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELV COMPONENTS AT DISTRICT HOSPITAL CHENGANNUR Dec. 5, 2024, midnight Dec. 24, 2024, midnight
WAP/INFRA/KERALA/2023/KSGD/470 Construction of 5 lakhs litre capacity underground water tank & other allied works including work of pipeline and pumping system at KINFRA Small Industries Park, Kasaragod Dec. 4, 2024, midnight Jan. 2, 2024, midnight
WAP/ED (IP)/B/HOSTEL/ODISHA/2024/11 Construction of 100 seated OBC hostel (B) at SCS Autonomous College , Puri District Nov. 29, 2024, midnight Dec. 5, 2024, midnight
GEM/2024/B/5651439 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for the works Salumber Division, Rajsamand Division, Pratapgarh Division, Division Rural District Udaipur, Chittorgarh, Amet, Nimbahera and Begun (Package-5) in Udaipur Region, Rajasthan (2nd Call) Nov. 28, 2024, midnight Dec. 10, 2024, midnight
WAP/INFRA/KERALA/24/TSM/480-2 Engineering, Procurement and Construction (EPC) Contractor for Development of Kovalam & Adjacent beaches in Thiruvananthapuram, Kerala Nov. 27, 2024, midnight Dec. 10, 2024, midnight
GEM/2024/B/5651786 Hiring of Agency for Providing Services for Rendering Technical Logistic Support for the Development of Sports Infrastructure in Mandrem Goa Nov. 27, 2024, midnight Dec. 16, 2024, midnight
GEM/2024/B/5625122 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for Various works under Fisheries Department in Goa (3rd Call) Nov. 27, 2024, midnight Dec. 17, 2024, midnight
WAP/POW/T&DS&S/NIT/TOGO/AT2ER/2024/01 NOTICE INVITING TENDER FOR SELECTION OF LOCAL AGENCY FOR CARRYING OUT ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT STUDY/ FIELD WORK AND PREPARATION OF ENVIRONMENTAL & SOCIAL IMPACT ASSESSMENT REPORT AND ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN FOR RURAL ELECTRIFICATION OF 350 VILLAGES IN TOGO THROUGH SOLAR PHOTOVOLTAIC SYSTEMS (EXIM BANK FUNDED) Nov. 25, 2024, midnight Dec. 24, 2024, midnight
GEM/2024/B/5634459 Selection of Agency for “The assessment, recognition, and certification as a Great Place to Work” Nov. 22, 2024, midnight Jan. 7, 2025, midnight
WAP/SED (IP)/STSC/H/2024/24 CONSTRUCTION OF 120 SEATED ST HOSTEL AT DHODIPAN HSS AT DHODIPAN, CHANDAHANDI IN THE DISTRICT OF NABARANGPUR, ODISHA Nov. 21, 2024, midnight Nov. 27, 2024, midnight
WAP/ED (IP)/G/HOSTEL/ODISHA/2024/4 New CONSTRUCTION OF 100 SEATED OBC HOSTEL (G) ATJASHIPUR COLLEGE, JASHIPUR, MAYURBHANJA DISTRICT Nov. 21, 2024, midnight Nov. 27, 2024, midnight
WAP/SED (IP)/STSC/H(B)/2024/17 CONSTRUCTION OF 120 SEATED HOSTEL OF ST STUDENTS AT P. DAKALAGUDA GOVT. HIGH SCHOOL, BISSAMCUTTACK, RAYAGADA DISTRICT Nov. 21, 2024, midnight Nov. 28, 2024, midnight
WAP/SED (IP)/STSC/H/2024/29 new CONSTRUCTION OF 120 SEATED HOSTELS OF ST STUDENTS AT SHIBAPADAR GOVT. HIGH SCHOOL, MUNIGUDA, RAYAGADA DISTRICT, ODISHA Nov. 21, 2024, midnight Nov. 28, 2024, midnight
WAP/SED(IP)/STSC/H/2024/21 New CONSTRUCTION OF 120 SEATED ST HOSTELS AT BIJU PATTANAIK WOMEN’S COLLEGE AT SUBARNAPUR, ODISHA Nov. 21, 2024, midnight Nov. 28, 2024, midnight
WAP/INFRA/KERALA/24/WCPM/490-2 CONSTRUCTION OF WCH BUILDING AT PONNANI, MALAPPURAM- PHASE-2 Nov. 20, 2024, midnight Dec. 3, 2024, midnight
WAP/CMU-III/2024-25/SMFPL/Agartala/09 SURVEY, INVESTIGATION, PLANNING, DESIGNING AND CONSTRUCTION OF NATIONAL INDUSTRIAL TOWNSHIP AT AGARTALA, TRIPURA ON EPC MODE-I Nov. 20, 2024, midnight Dec. 18, 2024, midnight
WAP/INFRA/KERALA/2024/KOTH/492 CONSTRUCTION OF KOOTHUPARAMBA TOWN HALL (PHASE-3) Nov. 20, 2024, midnight Dec. 4, 2024, midnight
WAP/ENVT/ESIC-ARMO/ MAHARASHTRA /2024/PKG-3/01 ANNUAL REPAIR, MAINTENANCE AND OPERATION (AMRO) WORKS OF CIVIL, ELECTRICAL AND MEP SERVICES ON LUMPSUM SERVICE CHARGES ON DEPOSIT WORK BASIS FOR ESIS HOSPITAL AND STAFF QUARTERS AT KANDIVALI, MUMBAI (PACKAGE-3) Nov. 19, 2024, midnight Nov. 29, 2024, midnight
WAP/ENVT/ESIC-ARMO/ODISHA/PKG-3/2024/03 ANNUAL REPAIR AND MAINTENANCE OF RESIDENTIAL AND NON-RESIDENTIAL BUILDING (CIVIL AND ELECTRICAL WORK) AT ESIC DIRECTORATE BUILDINGS AND ESIC HOSPITAL JAYKAYPUR RAYGADA CAMPUS (PACKAGE-3) Nov. 19, 2024, midnight Nov. 29, 2024, midnight
WAP/ENVT/ESIC-ARMO/ODISHA /2024/Pkg-1/01 ANNUAL REPAIR AND MAINTENANCE OF RESIDENTIAL AND NON-RESIDENTIAL BUILDING (CIVIL AND ELECTRICAL WORK) AT ESI HOSPITAL CHOUDWAR (PACKAGE-1) Nov. 19, 2024, midnight Nov. 29, 2024, midnight
WAP/INFS-1/IIMM/R&M/2024/02 Selection of Contractor for “Site Barricading along the Boundary Wall in IIM Mumbai Campus Nov. 19, 2024, midnight Dec. 5, 2024, midnight
WAP/ENVT/ESIC-ARMO/ODISHA/PKG-2/2024/02 ANNUAL REPAIR AND MAINTENANCE OF RESIDENTIAL AND NON-RESIDENTIAL BUILDING (CIVIL AND ELECTRICAL WORK) AT ESI JAGATPUR & TPM CAMPUS (PACKAGE-2) Nov. 19, 2024, midnight Nov. 29, 2024, midnight
WAP/ENVT/ESIC-ARMO/ODISHA/PKG-4/2024/04 ANNUAL REPAIR AND MAINTENANCE (CIVIL & ELECTRICAL) AT ESIC RO OFFICE CAMPUS, ESI DISPENSARY SAHEEDNAGAR AND ESIC STAFF QUARTER NAYAPALI (PACKAGE-4) Nov. 19, 2024, midnight Nov. 29, 2024, midnight
WAP/Ropeways/2024-25/08 Architectural Services for Preparation of Feasibility Report for implementation of Ropeways in Indore Nov. 13, 2024, midnight Nov. 27, 2024, midnight
WAP/PH&IW /TPA/TRAFFIC/2024 TRAFFIC STUDY FOR “FEASIBILITY STUDIES AND PRELIMINARY ENGINEERING DESIGNS FOR THE IMPROVEMENT OF KALEMIE AND MOBA PORTS ALONG LAKE TANGANYIKA Nov. 13, 2024, midnight Nov. 27, 2024, midnight
GEM/2024/B/5589145 Hiring of Agency for carrying out - Geo-technical Investigation for MBRAPP -1 to 4 Nov. 11, 2024, midnight Dec. 15, 2024, midnight
WAP/PROJECTS/DDN/GEOTECHNICAL/ RR JAMRANI PLAN/2024 Appointment of agency for carrying out Geotechnical investigation works and soil Analysis for Formulation Of (Rehabilitation & Resettlement) Master Plan At Proposed Site Situated At Prag Farm, Tehsil- Kiccha, Dist-Udham Singh Nagar, Uttrakhand For Project Affected Families Of Jamrani Drinking Water Multipurpose Project Nov. 8, 2024, midnight Nov. 19, 2024, midnight
WAP/ INFRA./NK/RMC(P7)/2024 Package 7 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 68.37 to 75.39 km under North Koel Reservoir Project, Jharkhand and Bihar Nov. 1, 2024, midnight Nov. 20, 2024, midnight
WAP/INFS-IV/HP/Kangra/Sportscomplex/2024 CONSTRUCTION OF MULTIPURPOSE SPORTS COMPLEX AT HATWAS NAGROTA BAGWAN, KANGRA, HIMACHAL PRADESH Oct. 28, 2024, midnight Nov. 25, 2024, midnight
GEM/2024/B/5545164 APPOINTMENT OF AGENCY FOR CARRYING OUT ALIGNMENT SURVEY WORK FOR TANK AND DRAIN CONNECTIVITY STRUCTURE ON DISTRIBUTARIES AND MINORS. Oct. 25, 2024, midnight Nov. 9, 2024, midnight
WAP/CMU-I/NOIDA-ARCH/2024-25/05 Comprehensive Architectural & Structural Design, Drawings, Detailed Estimation for Construction of Central Board of Secondary Education, (CBSE) Regional Office & COE Building in Sector-33 A, Noida (UP). Oct. 25, 2024, midnight Nov. 15, 2024, midnight
GEM/2024/B/5542758 GEOTECHNICAL INVESTIGATION (CORE DRILLING) FOR DANGARI PUMPED STORAGE HYDRO ELECTRIC PROJECT (1400 MW), CHHATTISGARH Oct. 25, 2024, midnight Nov. 14, 2024, midnight
WAP/TN/5/ TOPOGRAPHIC & HYDROGRAPHIC SURVEYS /RRR/ PUDUCHERRY/2024 Topographic & Hydrographic Surveys of Tanks and its Irrigation Infrastructure at Puducherry Oct. 25, 2024, midnight Nov. 5, 2024, midnight
GEM/2024/B/5546562 SUPPLY & INSTALLATION OF FURNITURE FOR CONSTRUCTION OF EKLAVYA MODEL RESIDENTIAL SCHOOL (EMRS) MANPUR, DISTRICT RAJNANDGAON AT CHHATTISGARH Oct. 25, 2024, midnight Nov. 25, 2024, midnight
GEM/2024/B/5507679 ARCHITECTURAL CONSULTANCY FOR CONSTRUCTION OF ROPE CAR ARULMIGU VEDAGIREESWARA TEMPLE, THIRUKALKUNDRAM DIST., TAMILNADU Oct. 24, 2024, midnight Nov. 18, 2024, midnight
GEM/2024/B/5530003 ARCHITECTURAL CONSULTANCY FOR CONSTRUCTION OF ROPE CAR - ARULMIGU RANGANATHA PERUMAL TEMPLE, THIRUNEERMALAI, PALLAVARAM, DISTRICT, CHENGALPET Oct. 24, 2024, midnight Nov. 14, 2024, midnight
GEM/2024/B/5534358 Geotechnical Investigation (Core Drilling) for Rouni Pumped Storage Project (2100 MW), Chhattisgarh Oct. 23, 2024, midnight Nov. 14, 2024, midnight
WAP/INFRA/KERALA/24/WCPM/490-1 CONSTRUCTION OF WCH BUILDING AT PONNANI, MALAPPURAM- PHASE-2 Oct. 23, 2024, midnight Nov. 4, 2024, midnight
WAP/INFRA/KERALA/2024/GAHK/492 Setting up of 30 Bedded Integrated Ayush Hospital at Kottarakkara in Kollam District Oct. 23, 2024, midnight Nov. 13, 2024, midnight
GEM/2024/B/5527255 Appointment of agency for conducting a comprehensive social census survey focused on families impacted by proposed development works of Kharag Hydro Electric Project (63 MW) of OHPC in the state of Odisha Oct. 21, 2024, midnight Nov. 11, 2024, midnight
GEM/2024/B/5526964 Appointment of agency for conducting a comprehensive social census survey focused on families impacted by proposed development works of Upper Indravati Pumped storage project, OHPC in the state of Odisha Oct. 21, 2024, midnight Nov. 11, 2024, midnight
GEM/2024/B/5515288 Geo-technical Investigation at Proposed Dam Location for Koila Nallah Water Supply Scheme at Mannarghat, South Andaman Oct. 18, 2024, midnight Nov. 1, 2024, midnight
GEM/2024/B/5519563 Comprehensive Architectural Services for “Construction of 80 No’s Godowns of capacity 200 MT at Different PACS/LAMPCS” under RIDF Scheme across Odisha Oct. 18, 2024, midnight Dec. 3, 2024, midnight
WAP/CMU-II/2024-25/IIT(ISM)/Flood Light/06 Supply, Installation, Testing and Commissioning of Flood Light in Upper Ground at IIT (ISM) Dhanbad Oct. 17, 2024, midnight Nov. 18, 2024, midnight
GEM/2024/B/5497593 HIRING OF AGENCY FOR FIELD SURVEYS, PROVIDING TECHNICAL MANPOWER SUPPORT FOR CARRYING OUT WATER FEASIBILITY AND WATER DRAWL STUDY (COMPRISING CIVIL, MECHANICAL, ELECTRICAL AND C&I ASPECTS) FROM GANGA RIVER IN MIRZAPUR DIST. U.P. Oct. 11, 2024, midnight Nov. 1, 2024, midnight
GEM/2024/B/5492489 PREPARATION OF DPR, DETAILED STRUCTURAL DESIGNS, AND DRAWINGS FOR THE CONSTRUCTION OF ADDITIONAL BLOCK IN PHC VADAKKANCHERRY Oct. 10, 2024, midnight Oct. 21, 2024, midnight
GEM/2024/B/5492552 PREPARATION OF DPR, DETAILED STRUCTURAL DESIGNS, AND DRAWINGS FOR THE CONSTRUCTION OF NEDUMKANDAM MODERN MARKET (PHASE 2) Oct. 10, 2024, midnight Oct. 21, 2024, midnight
GEM/2024/B/5493182 Geotechnical Investigation (Core Drilling) for Hasdeo Bango Pumped Storage Project (800 MW), Korba district, Chhattisgarh Oct. 10, 2024, midnight Nov. 4, 2024, midnight
GEM/2024/B/5492605 SELECTION OF CONSULTANT/AGENCY FOR OBTAINING STATUTORY CLEARANCES FOR DEVELOPMENT OF TALUK HOSPITAL, KOYILANDI IN KOZHIKODE DISTRICT Oct. 10, 2024, midnight Oct. 21, 2024, midnight
GEM/2024/B/5491851 PREPARATION OF DETAILED PROJECT REPORT AND DRAWINGS FOR THE WATER SUPPLY AND INFRASTRUCTURE DEVELOPMENT WORKS AT KINFRA INDUSTRIAL PARK, MATTANNUR Oct. 10, 2024, midnight Oct. 21, 2024, midnight
WAP/ GWRD&M/ DRILLING-DWLR/2024-25/01 DRILLING, CONSTRUCTION OF APPROX. 138 NOS. PIEZOMETERS WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 138 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) ALONG WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 43 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) IN EXISTING PIEZOMETERS UNDER FMDA AREA Oct. 9, 2024, midnight Nov. 6, 2024, midnight
GEM/2024/B/5487685 Appointment of Agency for carrying out topographical survey for Water Supply / Sewerage Schemes in Maharashtra State Oct. 9, 2024, midnight Oct. 30, 2024, midnight
WAP/ GWRD&M/DRILLING-DWLR/2024-25/02 DRILLING, CONSTRUCTION OF APPROX. 134 NOS. PIEZOMETERS WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 134 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) ALONG WITH SUPPLY, INSTALLATION AND COMMISSIONING OF 49 NOS. DIGITAL WATER LEVEL RECORDER (DWLRS) IN EXISTING PIEZOMETERS UNDER GMDA AREA Oct. 9, 2024, midnight Nov. 6, 2024, midnight
GEM/2024/B/5489012 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for the works Salumber Division, Rajsamand Division, Pratapgarh Division, Division Rural District Udaipur, Chittorgarh, Amet, Nimbahera and Begun (Package-5) in Udaipur Region, Rajasthan Oct. 9, 2024, midnight Oct. 23, 2024, midnight
WAP/INFRA/KERALA/2024/KOYI/491 DEVELOPMENT OF TALUK HOSPITAL KOYILANDI IN KOZHIKODE DISTRICT Oct. 7, 2024, midnight Jan. 4, 2025, midnight
WAP/CMU-II/2024-25/ Bastawa Mata/05 Supply, fabrication & installation of railings and gates over Gotawar dam top at village Bastawa Mata, district Jodhpur, Rajasthan Oct. 7, 2024, midnight Oct. 28, 2024, midnight
WAP/CMU-II/2024-25/ Bastawa Mata/04 Levelling of ground, river channelization at downstream reach of the Gotawar dam at village Bastawa Mata, district Jodhpur, Rajasthan Oct. 7, 2024, midnight Oct. 28, 2024, midnight
WAP/ENVT/PGICH/SR-E&M/PKG-9/2024/09 SPECIAL REPAIR WORKS: SITC OF VARIOUS ELECTRO-MECHANICAL MODALITIES AT PGICH, SECTOR 30-NOIDA (PACKAGE-9) Oct. 3, 2024, midnight Oct. 22, 2024, midnight
GEM/2024/B/5466716 Carrying out Topographical & Hydrographic survey for free flow discharge studies of Nagarjuna Sagar Pump House, Telangana State Oct. 3, 2024, midnight Oct. 24, 2024, midnight
WAP/ENVT/ESIC/SR-ROHINI/PKG-5/2024/05 SPECIAL REPAIR WORK-SUPPLYING AND LAYING OF LT CABLE WITH PROVISION OF PANEL FOR PSA PLANT IN SEC-15, ESIH ROHINI, NEW DELHI (PACKAGE-5) Oct. 3, 2024, midnight Oct. 17, 2024, midnight
WAP/CMU-II/2024-25/NESTS/Odisha/Gudari/03 Construction of Eklavya Model Residential School at Gudari, District- Rayagada, Odisha Oct. 1, 2024, midnight Oct. 15, 2024, midnight
WAP/SED(IP)/SSEPD/IIC/2024/21 Re-tender CONSTRUCTION OF INTEGRATED INFRASTRUCTURE COMPLEX (IIC) IN BOLANGIR DISTRICT OF THE STATE OF ODISHA Oct. 1, 2024, midnight Oct. 7, 2024, midnight
GEM/2024/B/5460089 Topographical Surveys (Drone & DGPS) for Implementation of Ropeways in Indore City Oct. 1, 2024, midnight Oct. 11, 2024, midnight
WAP/ROPEWAYS/2024-25/02 (Call 2) Supply, Installing, Testing and Commissioning of High Mast Sports Flood Lighting as per FIH Specifications (Class I -Non- Televised) for Hockey Field at Sr. Secondary School, Majra, Dist. Sirmaur, Himachal Pradesh (Call 2) Oct. 1, 2024, midnight Oct. 15, 2024, midnight
GEM/2024/B/5430699 Supply and Installation of Furniture” in New OPD Block at National Institute of Ayurveda, Jaipur Sept. 23, 2024, midnight Oct. 3, 2024, midnight
GEM/2024/B/5430313 Hiring of Agency for Providing Technical Manpower in the State of Uttar Pradesh Sept. 23, 2024, midnight Oct. 7, 2024, midnight
WAP/INFRA/KERALA/2024/WCPM/490 Construction of WCH Building at Ponnani, Malappuram- Phase-2 Sept. 20, 2024, midnight Oct. 12, 2024, midnight
WAP/INFRA/KERALA/2024/CNMM/489 Construction of Modern Market Complex at Nedumkandam Phase 2 Sept. 20, 2024, midnight Oct. 12, 2024, midnight
WAP/MOZ/OSBP/2024/09-01 Selection of Agency for Geo-Technical Investigation Works One Stop Border Post Project at Mandimba Border between Malawi and Mozambique Sept. 20, 2024, midnight Nov. 15, 2024, midnight
GEM/2024/B/5414191 SELECTION OF CONSULTANT/AGENCY FOR OBTAINING STATUTORY CLEARANCES FOR DEVELOPMENT OF TALUK HOSPITAL, KOYILANDI IN KOZHIKODE DISTRICT Sept. 19, 2024, midnight Sept. 26, 2024, midnight
GEM/2024/B/5375823 Appointment of agency for Conducting Geophysical Survey for augmentation of water supply by extraction of ground water from both sides of DND flyover to old Okhla barrage and Kalindi Kunj to Jaitpur along Yamuna Flood Plains Sept. 17, 2024, midnight Sept. 30, 2024, midnight
GEM/2024/B/5407479 RFP for Selection of Agency for Measurement of discharge of various drains out falling in River Yamuna directly and all sub drains out falling in Najafgarh and Supplementary drains Sept. 17, 2024, midnight Oct. 8, 2024, midnight
WAP/ENVT/CH/Baseline data collection/2024/1 Analysis of water and soil samples and monitoring Ambient Air and Noise Quality for various Environment Impact Assessment (EIA) projects of WAPCOS Chennai project office Sept. 13, 2024, midnight Oct. 4, 2024, midnight
GEM/2024/B/5388136 SELECTION OF AGENCY FOR “ESTABLISHMENT OF GROUND CONTROL POINTS (GCPs), CONNECT GCPs NETWORK ALONG WITH VALIDATION OF TOPOGRAPHICAL SURVEY WITH CONTOUR PLAN MAP WITH UTM COORDINATES” FOR EMINI, AMULIN AND MIHUMDON HEP’S IN ARUNACHAL PRADESH Sept. 12, 2024, midnight Sept. 30, 2024, midnight
WAP/INFRA/KERALA/24/MEKK/484-1 Upgradation of CHC to Block FHC at PHC Mekkunnu, Kannur District Sept. 12, 2024, midnight Sept. 19, 2024, midnight
GEM/2024/B/5387649 Conducting Geotechnical Investigations (Subsurface) for Uttarandhra Sujala Sravanthi Project on River Godavari, Andhra Pradesh Sept. 11, 2024, midnight Oct. 3, 2024, midnight
WAP/GOA/Fisheries/2023-24/03 Design, Fabrication and Installation of Artificial Reefs along the coast of Goa State Sept. 11, 2024, midnight Sept. 24, 2024, midnight
WAP/INFS-1/Goa/2024/Fisheries/02 Hiring of Agency for Providing Manpower, Infrastructure, Logistics & Technical Support for Various works under Fisheries Department in Goa (2nd Call) Sept. 11, 2024, midnight Sept. 16, 2024, midnight
GEM/2024/B/5308438 Empanelment of Material Testing Laboratory regarding- TPA Projects Sept. 10, 2024, midnight Sept. 26, 2024, midnight
GEM/2024/B/5378341 Geotechnical Investigations (Subsurface) for Thadavaiyar Reservoir, Tamilnadu Sept. 10, 2024, midnight Sept. 30, 2024, midnight
WAP/PMGSY/2024-25/Maintenance/EM5 Emergency Maintenance Work including Slip Clearance and Construction of Protection Work for Jakhol to Liwari Motor Road, Block- Mori, Distt. Uttarkashi under SDRF (DM Fund) in Uttarakhand. Sept. 7, 2024, midnight Nov. 21, 2024, midnight
WAP/INFRA/KERALA/24/KTYBW/487-1 IMPLEMENTATION OF OPD TRANSFORMATION WORK AT TH KUTTIYADI KOZHIKODE – BALANCE WORKS Sept. 6, 2024, midnight Sept. 13, 2024, midnight
WAP/CED/Chheoki/2024/01 CONSTRUCTION OF ARTH GANGA CENTER AND BRANDING AT RAILWAY STATION CHHEOKI, PRAYAGRAJ, UTTAR PRADESH Sept. 6, 2024, midnight Sept. 17, 2024, midnight
GEM/2024/B/5363710 Hiring of NABL accredited Laboratory for testing purpose at 3 locations i.e., Vijayawada, Visakhapatnam and Tirupati zones for PMC & TPQC services of MPFC’s of APAGMKT Project Sept. 5, 2024, midnight Oct. 1, 2024, midnight
GEM/2024/B/5330207 Analysis of water and soil samples and monitoring Ambient Air and Noise Quality for Environment Impact Assessment (EIA) study of “Construction of Jetty and associated facilities for Indian Coast Guard, Campbell bay, Great Nicobar Island Sept. 4, 2024, midnight Sept. 28, 2024, midnight
WAP/ENVT/ESIC/SR-GOA/PKG-1/2024/01 Special Repair Works of Compound Wall at 150 Bedded ESIC Hospital Mulgao, Goa (Package-I) Sept. 2, 2024, midnight Sept. 16, 2024, midnight
WAP/WRD/RAJ/IGNP/SAHWA/JPR/2024-25/01 Supply of Stones for Rectangular and sub rectangular survey for Choudhary Kumbha Ram Arya Lift Canal (Sahwa Lift Canal) of IGNP Aug. 27, 2024, midnight Sept. 10, 2024, midnight
GEM/2024/B/5322937 Selection of Agency for “The assessment, recognition, and certification as a Great Place to Work” Aug. 23, 2024, midnight Sept. 19, 2024, midnight
WAP/INFRA/KERALA/2024/CHBW/485 IMPLEMENTATION OF OPD TRANSFORMATION IN THQH CHANGANASSEY KOTTAYAM DISTRICT – BALANCE WORKS Aug. 21, 2024, midnight Aug. 30, 2024, midnight
WAP/INFRA/KERALA/2024/NDBW/488 IMPLEMENTATION OF OPD TRANSFORMATION WORKS AT TH NADAPURAM KOZHIKODE – BALANCE WORKS Aug. 21, 2024, midnight Sept. 3, 2024, midnight
WAP/ENVT/AIIA-ARM/GOA/2024/Pkg-2 COMPREHENSIVE ANNUAL REPAIR MAINTENANCE & OPERATION (CARMO) WORKS ALONG WITH RENOVATION/INTERIOR WORKS AT AIIA GOA (PACKAGE-II) Aug. 21, 2024, midnight Sept. 17, 2024, midnight
GEM/2024/B/5311814 Independent Third Party Survey for the work of “Maintenance Dredging at Mormugao Port for the year 2024” Aug. 21, 2024, midnight Sept. 11, 2024, midnight
WAP/INFRA/KERALA/2024/KTYBW/487 IMPLEMENTATION OF OPD TRANSFORMATION WORK AT TH KUTTIYADI KOZHIKODE – BALANCE WORKS Aug. 21, 2024, midnight Aug. 31, 2024, midnight
WAP/INFRA/KERALA/2024/KVBW/486 IMPLEMENTATION OF OPD TRANSFORMATION AT TH KARUVELIPPADY ERNAKULAM – BALANCE WORKS Aug. 21, 2024, midnight Aug. 31, 2024, midnight
WAP/INFRA/KERALA/24/TSM/480-1 Engineering, Procurement and Construction (EPC) Contractor for Development of Kovalam & Adjacent beaches in Thiruvananthapuram, Kerala Aug. 21, 2024, midnight Oct. 24, 2024, midnight
WAP/ENVT/AIIA-GOA/SR/PKG-IV/2024/04 SPECIAL REPAIR- REPAIR AND RENOVATION (ELECTRICAL & CIVIL) WORKS AT AIIA, GOA (PACKAGE-IV) Aug. 21, 2024, midnight Sept. 10, 2024, midnight
WAP/ENVT/AIIA-GOA/SR/PKG-1II/2024/03 CONSTRUCTION OF SOLAR CAR PARKING FACILITIES AT VARIOUS LOCATIONS IN ALL INDIA INSTITUTE OF AYURVEDA, GOA (PACKAGE-III) Aug. 21, 2024, midnight Sept. 10, 2024, midnight
GEM/2024/B/5308099 Appointment of NABL accredited laboratories for carrying out Field Material Quality Testing and Inspection of the Materials procured by DISCOMs/TKCs in the State of AP & Puducherry along with loading-unloading & Pick-Drop facility Aug. 20, 2024, midnight Sept. 6, 2024, midnight
WAP/ROPEWAYS/2024-25/01- Retendering Supply and Installation of Furniture For Convention Centre at Aizwal, Mizoram Aug. 19, 2024, midnight Sept. 6, 2024, midnight
GEM/2024/B/5296231 Traffic Surveys & Ridership Estimation for Preparation of Feasibility Report for Implementation of Ropeways in Indore Aug. 16, 2024, midnight Sept. 6, 2024, midnight
GEM/2024/B/5296056 Topographical Surveys (Drone & DGPS) for Implementation of Ropeways in Indore City Aug. 16, 2024, midnight Sept. 6, 2024, midnight
WAP/INFRA/KERALA/2024/VDKD/483 Implementation of Upgradation works at CHC Vadakkekadu , Thrissur District Aug. 14, 2024, midnight Aug. 27, 2024, midnight
WAP/INFRA/KERALA/2024/MEKK/484 Upgradation of CHC to Block FHC at PHC Mekkunnu, Kannur District Aug. 14, 2024, midnight Aug. 28, 2024, midnight
WAP/ENVT/ESIC-ARMO/PARWANOO/2024/01 Annual Repair, Maintenance & Operation (ARMO) works of Civil & Electrical for ESIS Hospital & Staff Quarters, Parwanoo Aug. 13, 2024, midnight Aug. 28, 2024, midnight
GEM/2024/B/5274108 Carrying out Topographical & Hydrographic survey for free flow discharge studies of Nagarjuna Sagar Pump House, Telangana State Aug. 9, 2024, midnight Aug. 30, 2024, midnight
GEM/2024/B/5263867 Hiring of Mobile Van from NABL accredited laboratory for testing purpose on monthly basis for sites at erstwhile Rangareddy, Medak, Nalgonda, Mahabubnagar and Nizamabad district ULBs in Telangana State for TPQC services of TUFIDC Project Aug. 8, 2024, midnight Aug. 31, 2024, midnight
WAP/CMU-III/2023-24/ NESTS /CHTGH/BIJAPUR/49 Construction of Eklavya Model Residential School at Bijapur, District Bijapur, Chhattisgarh Aug. 3, 2024, midnight Aug. 22, 2024, midnight
WAP/SED(IP)/SSEPD/IIC/2024/21 Construction of Integrated Infrastructure Complex (IIC) in Bolangir District of the State of Odisha July 31, 2024, midnight Aug. 5, 2024, midnight
WAP/SED (IP)/STSC/H (B/G)/2024/34 CONSTRUCTION OF 120x2 SEATED HOSTELS (B/G) AT NSB DEGREE COLLEGE AT TUMUDIBANDHA IN THE DISTRICT OF KANDHAMAL, ODISHA July 31, 2024, midnight Aug. 14, 2024, midnight
WAP/SED(IP)/SSEPD/IIC/2024/21 Construction of Integrated Infrastructure Complex (IIC) in Bolangir District of the State of Odisha July 31, 2024, midnight Aug. 5, 2024, midnight
GEM/2024/B/5226582 ARCHITECTURAL CONSULTANCY FOR CONSTRUCTION & DEVELOPMENT OF INFRASTRUCTURE WORKS JUST RIGHT- NEAR THANE MAHARASHTRA July 31, 2024, midnight Aug. 14, 2024, midnight
WAP/SED(IP)/STSC/H (G)/2024/37 CONSTRUCTION OF 120 SEATED ST HOSTEL(G) AT GOVT.HSS AT KOTAGADA, KANDHAMAL July 30, 2024, midnight Aug. 13, 2024, midnight
WAP/SED (IP)/STSC/H(G)/2024/38 CONSTRUCTION OF 120 SEATED ST HOSTEL (G) AT GOVT. HSS AT GUMMA IN THE DISTRICT OF KANDHAMAL, ODISHA July 30, 2024, midnight Aug. 13, 2024, midnight
WAP/SED(IP)/STSC/H (B)/2024/35 CONSTRUCTION OF 120 SEATED ST HOSTEL(B) AT GOVT.HSS AT KOTAGADA, KANDHAMAL July 30, 2024, midnight Aug. 13, 2024, midnight
WAP/CED/CHAMBA/2024/01 CONSTRUCTION OF INDOOR SPORTS STADIUM AT CHAMBA, HIMACHAL PRADESH July 30, 2024, midnight Aug. 21, 2024, midnight
WAP/SED(IP)/STSC/H (G)/2024/25 CONSTRUCTION OF 120 SEATED ST HOSTEL AT GOVT.SSD GIRLS HS, K.C.PUR (GUMMA) IN THE DISTRICT OF GAJAPATI. July 29, 2024, midnight Aug. 12, 2024, midnight
WAP/CMU-II/2024-25/ NIA Panchkula/OT/02 Establishment of Modular Operation Theatres and allied Civil, MEP Works for National Institute of Ayurveda (NIA), Panchkula July 24, 2024, midnight Aug. 22, 2024, midnight
WAP/CED/Paonta Sahib/2024/01 Development of Ghat & Crematorium at Paonta Sahib, Himachal Pradesh under Namami Gange Mission - II July 23, 2024, midnight Aug. 13, 2024, midnight
GEM/2024/B/5196324 CONSULTANT/AGENCY FOR TOPOGRAPHICAL SURVEY & WATER INVESTIGATION WORKS FOR PREPARATION OF DPR FOR USED WATER MANAGEMENT UNDER SWACHH BHARAT MISSION 2.0 FOR DURG DIVISION IN CHHATTISGARH July 23, 2024, midnight Aug. 3, 2024, midnight
GEM/2024/B/5196272 CONSULTANT/AGENCY FOR TOPOGRAPHICAL SURVEY & WATER INVESTIGATION WORKS FOR PREPARATION OF DPR FOR USED WATER MANAGEMENT UNDER SWACHH BHARAT MISSION 2.0 FOR BILASPUR DIVISION IN CHHATTISGARH July 23, 2024, midnight Aug. 3, 2024, midnight
WAP/ROPEWAYS/2024-25/02 Supply, Installing, Testing and Commissioning of High Mast Sports Flood Lighting as per FIH Specifications (Class I -Non- Televised) for Hockey Field at Sr. Secondary School, Majra, Dist. Sirmaur, Himachal Pradesh. July 19, 2024, midnight Sept. 2, 2024, midnight
GEM/2024/B/5166351 Carrying out Geotechnical Investigation works for development of the islands of shiyal & savai beyt (4th Attempt) July 16, 2024, midnight Sept. 5, 2024, midnight
GEM/2024/B/5151303 Manufacturing, Supply and Installation of Furniture For 300 Bedded Hostel at SAI, LNCPE Trivandrum July 15, 2024, midnight July 25, 2024, midnight
WAP/CMU-III/2024-25/AU/Silchar/07 Repair and Maintenance Works of Various Buildings at Assam University July 8, 2024, midnight July 19, 2024, midnight
WAP/CMU-III/2024-25/ AU/Silchar/07 Repair and Maintenance Works of Various Buildings at Assam University July 8, 2024, midnight July 19, 2024, midnight
WAP/ENVT/PGICH/SR-E&M/PKG-8/2024/08 WAP/ENVT/PGICH/SR-E&M/PKG-8/2024/08 July 5, 2024, midnight July 19, 2024, midnight
WAP/ENVT/PGICH/SR-E&M/PKG-8/2024/08 Replacement of VRV/VRF System for Multi Purpose Hall and Repair/Replacement of various parts for Lift no. 2 of Tower 9 at PGICH, Sector 30-Noida July 5, 2024, midnight July 19, 2024, midnight
WAP/SED(IP)/STSC/H (B/G)/2024/18 CONSTRUCTION OF 120x2 SEATED HOSTELS OF ST (BOYS AND GIRLS) STUDENTS AT MATHAKARGOLA, BHUBAN, DHENKANAL, ODISHA July 4, 2024, midnight June 17, 2024, midnight
WAP/SED (IP)/STSC/H (B/G)/2024/31 CONSTRUCTION OF 4 NOs. OF 120 SEATED HOSTELS OF ST STUDENTS AT UGHS NAKAMAMUDI, MUDULIGUDA UPS, BHIMA MADKANI HS, IRALGUNDI AND UGME DERPALI, MALKANGIRI, ODISHA July 4, 2024, midnight Oct. 17, 2024, midnight
WAP/PMGSY/2024-25/Maintenance/SM2/7.70 Special Maintenance Work for Bhikiyasain to Baina-karakot Motro Road, July 3, 2024, midnight July 18, 2024, midnight
WAP/PMGSY/2024-25/Maintenance/SM2/3.750 Special Maintenance Work for Khunt-Kakrighat Motor Road to Dhatwalgaon Motor Road, Length-3.750 Km. Block Hawalbagh, Distt. Almora under PMGSY in Uttarakhand July 3, 2024, midnight July 28, 2024, midnight
WAP/PMGSY/2024-25/Maintenance/SM2/5.18 Special Maintenance Work for Birtha to Taraswar Motor Road, Length-5.18 July 3, 2024, midnight July 18, 2024, midnight
WAP/PMGSY/2024-25/Maintenance/SM2/4.90 Special Maintenance Work for Lachhmola to Nauban Motor Road, Length-4.90 Km, Block-Tarikhet, Distt. Almora under PMGSY in Uttarakhand July 3, 2024, midnight July 18, 2024, midnight
GEM/2024/B/5103290 Providing Consultancy Services for Market Assessment, Financial Analysis, Advertisement, Marketing and Sales Services of Built-up area of Development of National Industrial Township Project at Agartala June 28, 2024, midnight July 13, 2024, midnight
WAP/SED(IP)/STSC/H/2024/30 CONSTRUCTION OF 120 SEATED ST HOSTEL AT UGHS AT GIRLIGUMMA (DASAMANTPUR) IN THE DISTRICT OF KORAPUT. June 28, 2024, midnight July 11, 2024, midnight
WAP/SED (IP)/STSC/H/2024/29 old CONSTRUCTION OF 120 SEATED HOSTELS OF ST STUDENTS AT SHIBAPADAR GOVT. HIGH SCHOOL, MUNIGUDA, RAYAGADA DISRICT, ODISHA June 28, 2024, midnight July 11, 2024, midnight
GEM/2024/B/5105665 Architectural Design, Engineering, Drawing & Allied Services for the Construction & Development of Infrastructure Works at Battalion Headquarters SSB Thakurganj, Bihar June 28, 2024, midnight Aug. 9, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/03/Package-08 Emergency Maintenance Work including slip clearance for Road Supi to Jhuni, L057, Length-9.90 Km, Block Kapkot, PIU-Kapkot. During Monsoon Period of Year 2024-25 (package-08) June 26, 2024, midnight July 2, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/03/Package-04 Emergency Maintenance Work including slip clearance for Road Chalina china to selakot kane rikhad mehragaon, Length-15.50 Km. Block-Dhauladevi PIU-Bhatrojkhan, during Monsoon Period of Year 2024-25 (Package-04) June 26, 2024, midnight July 2, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/03/Package-01 Emergency Maintenance Work including slip clearance for Road (Package-01) (a) Lachhmola to Nauban, Motor Road, Length-4.90 Km.(b) Bhikiyasain to Baina-karakot M/R, Length-7.70 Km. Block-Tarikhet, PIU-Bhatrojkhan during Monsoon Period of Year 2024-25 June 26, 2024, midnight July 2, 2024, midnight
GEM/2024/B/5087133 Procurement, Supply, Installation, Testing & Demonstration of Furniture, Curtains, Roller Blinds etc. for National Institute of Ayurveda (NIA) Panchkula, Haryana June 24, 2024, midnight July 12, 2024, midnight
GEM/2024/B/5086774 Manufacturing, Supply and Installation of Furniture For 300 Bedded Hostel at SAI, NSEC Kolkata June 24, 2024, midnight July 15, 2024, midnight
WAP/INFRA/KERALA/2024/KZNM/482 Upgradation of CHC to Block Family Health Centre at Kuzhalmannam, Palakkad District June 21, 2024, midnight June 28, 2024, midnight
WAP/INFRA/KERALA/2024/ANTU/481 Converting CHC Anchuthengu in Thiruvananthapuram District to Block Family Health Centre June 20, 2024, midnight June 27, 2024, midnight
GEM/2024/B/5071245 Consultancy services for Preparation of DPR, detailed structural designs, and drawings for the Construction of New Building for Teacher Education College Nedumkandam June 20, 2024, midnight July 11, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/02/Package-14 Emergency Maintenance Work including slip clearance for Bhudakedar to pinswar M/R, Length-20.00 Km. and Vinakhal to Gainwali Stage-II Length-6.00 Km, Block Bhilangna, PIU-Tehri” (Package-14). during Monsoon Period of Year 2024-25 June 17, 2024, midnight June 22, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/02/Package-10 Emergency Maintenance Work including slip clearance for (Package-10) (a) Bageshwar-Kapkot-M.R. to Beda-Majedha to Jarti Motor Road, Length-15.88 Km, Block-Kapkot (b) Balighat-Dofar to Khuldori Motor Road, Length-5.97 Km, PIU-Kapkot. during Monsoon Period of Year 2024-25 June 17, 2024, midnight June 22, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/02/Package-09 Emergency Maintenance Work including slip clearance for Road Bageshwar-Dofar-Kotmanya Rd. Motor Road Km 70 to Mahruri-Lamjaqara Motor Road, Length-5.00 Km, PIU-Kapkot (Package-09), during Monsoon Period of Year 2024-25 June 17, 2024, midnight June 22, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/02/Package-07 Emergency Maintenance Work including slip clearance for Road- (Package-07) (a) Bilona to Pagana Motor Road, Length-6.83 Km. Block-Bageshwar.(b) Garur Block to Matena-Jinkhola-Band-Kumroura Link M/R, Length-3.30 Km, Block Garur, Piu-Kapkot. during Monsoon Period of Year 2024-25 June 17, 2024, midnight June 22, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/02/Package-11 Emergency Maintenance Work including slip clearance for (Package-11) (a) Bhanar Lethi to Nauti Chetabagar Motor Road, Length-7.19 Km, Block-Kapkot.(b) Bageshwar-Kapkot-Tejam Motor Road Km 47 to Siri MR Length-11.10 Km, Block-Kapkot, PIU-Kapkot. during Monsoon Period of Year 2024-25 June 17, 2024, midnight June 22, 2024, midnight
WAP/CD/PMGSY/2024-25/Maintenance/SM1/Special Special Maintenance Work for Ghuttu Dyolyang to Bhatt Gaon Motor Road, Length- 6.63 km Block- Bhilangna, Distt. Tehri Garhwal under PMGSY in Uttarakhand June 15, 2024, midnight July 1, 2024, midnight
WAP/SED(IP)/STSC/H/2024/26 Construction of 120 Seated ST Hostel at Laxminarayan Govt. High UP School, Asanabani, Gadiapal, Kaptipada, Mayurbhanj, Odisha June 14, 2024, midnight June 26, 2024, midnight
WAP/SED (IP)/STSC/H/2024/32 Construction Of 120 Seated St Hostel At Talsara Primary & High School At Talsara, Balishankara, Sundergarh, Odisha June 14, 2024, midnight June 28, 2024, midnight
WAP/SED (IP)/STSC/H(B)/2024/28 Construction of 120 Seated ST Boys Hostel at Badanuapada High School at Badanuapada, Rairakhol, Sambalpur, Odisha” June 12, 2024, midnight June 26, 2024, midnight
WAP/SED(IP)/STSC/H(G)/2024//27 Construction of 120 Seated ST Hostel (G) at Malpada Sevashrama, Khaprakhol in the District of Balangir, Odisha June 12, 2024, midnight June 26, 2024, midnight
WAP/SED (IP)/STSC/H/2024/25 Construction of 120 Seated ST Hostels at Thakurmunda Govt. High School at Thakurmunda, Mayurbhanj June 12, 2024, midnight June 26, 2024, midnight
WAP/SED(IP)/STSC/H(B)/2024/28 CONSTRUCTION OF 120 SEATED ST HOSTEL AT BADANUAPADA HIGH SCHOOL AT BADANUAPADA, RAIRAKHOL, SAMBALPUR June 12, 2024, midnight June 26, 2024, midnight
EOI/WAP/PIP/ 2024/01 Empanelment of Reputed Design Agencies for Polavaram Irrigation Project, Andhra Pradesh on behalf of Polavaram Project Authority June 8, 2024, midnight Oct. 21, 2024, midnight
WAP/INFRA/KERALA/2024/TSM/480 Engineering, Procurement and Construction (EPC) Contractor for Development of Kovalam & Adjacent beaches in Thiruvananthapuram, Kerala June 7, 2024, midnight Aug. 27, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-05 Emergency Maintenance Work including slip clearance for Road: (Package-05) (a) Kapalkot (Kathpuria) to Batgal Bhat, L030, Length-5.38 Km. (b) Dwarsu To Khauri M/R, Stage-II, Length-6.300 Km. Block-Hawalbagh, (c) Paperseli Balta To Bintola M/R, Length-4.00 Km. Block-Hawalbagh, PIU-Bhatrojkhan. during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/KERALA/GEM/NMR/2023/002-1 Consultancy services for Preparation of DPR, detailed structural designs, and drawings for the Construction of a New Block at Hospital in Malappuram District June 6, 2024, midnight June 12, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-03 Emergency Maintenance Work including slip clearance for Road:- (Package-03) (a) Khunt-Kakrighat Rd. to Dhatwalgaon M/R, Length-3.75 Km. Block-Hawalbagh (b) Almiyakandey-Dihuli M/R to Enara MR, L048, Length-2.90 Km. Block-Tarikhet, PIU-Bhatrojkhan. during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-02 Emergency Maintenance Work including slip clearance for Road:- (Package-02) (a) Birtha to Taraswar, Motor Road, Length-5.18 Km. (b) Pathuli to Gairar Motor Road, Length-9.00 Km. Block-Tarikhet, PIU-Bhatrojkhan. during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/INFRA/KERALA/24/MPPM/479-1 OPD Transformation at THQH Malappuram District June 6, 2024, midnight June 30, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-15 Emergency Maintenance Work including slip clearance Ghuttu devlong to Bhatgaon M/R, Length-6.630 Km (Package-15), Block Bhilangna, PIU-Ghansali. during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-13 Emergency Maintenance Work including slip clearance for Arakot Bhutanu Motor Road km 10 damti -thunara Motor Road, length-12.150, Block Mori, PIU-Mori.(Package-13) during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-12 Emergency Maintenance Work including slip clearance for Odata (Khunigad) to Sarans Motor Road, Length-22.00 Km, Block Mori, PIU-Mori.(Package-12) during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/INFRA/KERALA/24/DVC/478-1 CONSTRUCTION OF NEW BUILDING FOR DISTRICT VECTOR CONTROL UNIT AT, KOZHIKODE DISTRICT June 6, 2024, midnight June 13, 2024, midnight
WAP/CD/PMGSY(JCB)/2024-25/01/Package-06 Emergency Maintenance Work including slip clearance for Road:-(Package-06) (a)Kukuchina (Manglikhan) to Chari (Nayal) Motor Road, Length-10.70, Block- Dwarahat (b) Masi-Gairkhet Motor Road to Parthola Motor Road, Length-6.00 Km Block Syaldey,PIU-Bhatrojkhan. during Monsoon Period of Year 2024-25 June 6, 2024, midnight June 15, 2024, midnight
WAP/KERALA/GEM/ERN/2023/001-2 Consultancy services for Preparation of DPR, detailed structural designs, and drawings for the Construction of Medical College/Hospital in Ernakulam District June 6, 2024, midnight June 19, 2024, midnight
WAP/INFS-II/BAGTHAN/2024-25/02 Civil works of setting up Farm for the “Conservation and Propagation of Himachali Pahari Cattle of Himachal Pradesh at Bagthan, District Sirmour, Himachal Pradesh June 3, 2024, midnight June 18, 2024, midnight
WAP/SED (IP)/STSC/H/2024/24 Construction of 120 Seated ST Hostel at Dhodipan HSS at Dhodipan, Chandahandi in the District of Nabarangpur, Odisha May 30, 2024, midnight June 10, 2024, midnight
WAP/ENVT/ESIC/SR-BASAI/PKG-2/2024/02 Special Repair Works-Removal/ Dismantling and Installation of new Duct to other rooms (Ultrasound room & respective corridor) in Ground Floor Radiology Department, OPD Building and Supply, Installation, Testing & Commissioning of 2 nos UPS (10 KVA ) on 2nd Floor OT block at ESIC MH Basaidarapur - (Package-2) May 27, 2024, midnight June 6, 2024, midnight
WAP/SED (IP)/HOSTEL/ODISHA/2024/16 Construction of 300 seated Boys Hostel (200 Minority + 100 OBC) at Govt. Autonomous College, Rourkela, Sundergarh May 27, 2024, midnight June 5, 2024, midnight
WAP/CED(E&CM)/THANE/2024/02 (3rd Call) Development and Beautification of Shree Hanuman Mandir, Hanuman Tekdi, Sion, Mumba May 27, 2024, midnight June 3, 2024, midnight
WAP/SED (IP)/STSC/H/2024/17 CONSTRUCTION OF 120 SEATED HOSTEL OF ST STUDENTS AT P. DAKALAGUDA GOVT. HIGH SCHOOL, BISSAMCUTTACK, RAYAGADA DISRICT May 27, 2024, midnight June 11, 2024, midnight
WAP/SED(IP)/STSC/H/2024/21 old CONSTRUCTION OF 120 SEATED ST HOSTELS AT BIJU PATTANAIK WOMEN’S COLLEGE AT SUBARNPUR, ODISHA May 27, 2024, midnight June 10, 2024, midnight
WAP/ED(IP)/G/HOSTEL/ODISHA/2024/7 Construction of 100 seated OBC Hostel (G) at Niranjan Govt. Women’s College at Aska, Ganjam May 14, 2024, midnight May 27, 2024, midnight
GEM/2024/B/4923277 Appointment of agency for topographical and contour survey work for restoration of minor irrigation scheme and repairs, rising and construction of percolation tank/ check dams in junagadh district of gujarat. May 9, 2024, midnight May 22, 2024, midnight
EOI/WAP/PIP/2024/01 Empanelment of Reputed Design Agencies for Polavaram Irrigation Project, Andhra Pradesh May 8, 2024, midnight July 18, 2024, midnight
GEM/2024/B/4893321 Hiring of NABL accredited Laboratory on monthly basis w.e.f 01.04.2024 to 30.09.2024 for testing purpose at 3 locations i.e.,Vijayawada, Visakhapatnam and Tirupati zones for PMC & TPQC services of APSHCL Project April 26, 2024, midnight May 17, 2024, midnight
WAP/ENVT/ESIC-KERALA/2023/08 Supply And Installation of Air Conditioning at Operation Theatre ESIC Hospital, Ezhukone, Kollam District April 25, 2024, midnight May 8, 2024, midnight
WAP/PHIW/KHURJA/KSTPP/2024-25/1 Construction of the Connection of Drains Connected to the Old Aligarh Drain to the Diverted Aligarh Drain April 18, 2024, midnight May 7, 2024, midnight
WAP/PH&IW /TPA/TRAFFIC/2024 - Retender Traffic Study for “Feasibility Studies and Preliminary Engineering Designs for the Improvement of Kalemie and Moba Ports Along Lake Tanganyika” April 15, 2024, midnight April 24, 2024, midnight
WAP/CMU-I/NDSA/2024-25/01 Renovation and Interior Works of NDSA Office at West Block-II & I, R.K. Puram, New Delhi April 8, 2024, midnight May 2, 2024, midnight
GEM/2024/B/4827742 Actuarial valuation of Trade receivables/ Retention money / Security Deposits etc. for providing ECL since 01.04.2015 March 31, 2024, midnight April 10, 2024, midnight
GEM/2024/B/4815271 Additional Geotechnical Investigations (Core Drilling) for Gandikota Pumped Storage Project, YSR District, Andhra Pradesh March 23, 2024, midnight April 6, 2024, midnight
WAP/INFS-IV/LADAKH/RDD/2023-24/21-2nd Call COMPLETION OF COMMUNITY HALL AT LHARDO, UNION TERRITORY OF LADAKH March 22, 2024, midnight April 18, 2024, midnight
WAP/INFRA./NK/DIST/JH/2024 Earthwork, Repair & Construction of Distribution Network (12 Nos. Minors) of Right Main Canal, Jharkhand and its Structures under North Koel Reservoir Project, Jharkhand and Bihar - Estimated Cost (Rs. 13.08 Crores excluding GST) March 16, 2024, midnight April 5, 2024, midnight
WAP/CMU-I/2023-24/ NESTS/MGH/TKR/37 Construction of Eklavya Model Residential School at Tikrikilla,District West Garo Hills, Meghalaya March 15, 2024, midnight April 5, 2024, midnight
WAP/CMU-I/2023-24/ NESTS/MGH/MWT/36 Construction of Eklavya Model Residential School at Mawkyrwat, District South West Khasi Hills, Meghalaya. March 15, 2024, midnight April 26, 2024, midnight
GEM/2024/B/4622048 Non Paper Printing Services - Quantity Based - ID card; Digital; PVC (as per ISO/IEC 7810) March 14, 2024, midnight March 25, 2024, midnight
WAP/CMU-II/2023-24/NESTS/Odisha/Balisankara/44 Construction of Eklavya Model Residential School at Balisankara, District - Sundargarh, Odisha March 14, 2024, midnight May 16, 2024, midnight
WAP/CMU-II/2023-24/NESTS/Odisha/Phulbani/41 Construction of Eklavya Model Residential School at Phulbani, District - Kandhamal, Odisha March 14, 2024, midnight May 16, 2024, midnight
WAP/CMU-II/2023-24/NESTS/Odisha/Laikera/45 Construction of Eklavya Model Residential School at Laikera, District - Jharsuguda, Odisha March 14, 2024, midnight May 9, 2024, midnight
WAP/CMU-II/2023-24/NESTS/Odisha/Lephripara/42 Construction of Eklavya Model Residential School at Lephripara, District - Sundargarh, Odisha March 14, 2024, midnight April 25, 2024, midnight
WAP/CMU-II/2023-24/NESTS/Odisha/Kutra/43 Construction of Eklavya Model Residential School at Kutra, District - Sundargarh, Odisha March 14, 2024, midnight May 9, 2024, midnight
WAP/ED(IP)/B/HOSTEL/ODISHA/8 Construction of 100 seated OBC Hostel (B) at Panchayat College, Dharmagarh, Kalahandi March 13, 2024, midnight March 22, 2024, midnight
GEM/2024/B/4774616 Preparation of DPR for Sewerage network & Sewerage Treatment Plant scheme in six Municipal Corporations Bettiah, Gopalganj, Bagaha, Chhapra, Kishanganj, Katihar under NMCG March 13, 2024, midnight March 26, 2024, midnight
WAP/CMU-II/2023-24/ NESTS /Odisha/Boriguma/40 Construction of Eklavya Model Residential School at Boriguma,District - Koraput, Odisha March 9, 2024, midnight March 30, 2024, midnight
WAP/CMU-III/2023-24/ NESTS /CHTGH/KONTA/50 Construction of Eklavya Model Residential School at Konta, District Sukma, Chhattisgarh March 8, 2024, midnight March 22, 2024, midnight
GEM/2024/B/4741096 Project Management Consultancy Services for Development of National Industrial Township Project at Agartala, Tripura March 6, 2024, midnight April 4, 2024, midnight
GEM/2024/B/4735905 Leasing In of Residential Properties - Guest House; Dry Lease (maintenance to be borne by lessee) March 6, 2024, midnight March 19, 2024, midnight
WAP/ED(IP)/O/H/ODISHA/2024/3 Construction of 120 bedded Old Age Home BLOCK A AND 200 bedded Hostel 100 boys and 100 girls BLOCK B for blind people at Unit III Bhubaneswar March 4, 2024, midnight March 13, 2024, midnight
WAP/ED(IP)/B/HOSTEL/ODISHA/2024/14 Construction of 100 seated Minority Hostel (B) at Rajadhani Degree College, Bhubaneswar Feb. 26, 2024, midnight March 6, 2024, midnight
WAP/ED (IP)/G/HOSTEL/ODISHA/2024/4 old CONSTRUCTION OF 100 SEATED OBC HOSTEL (G) AT JASHIPUR COLLEGE, JASHIPUR, MAYURBHANJA DISTRICT Feb. 24, 2024, midnight March 4, 2024, midnight
WAP/ED(IP)/G/HOSTEL/ODISHA/2024/10 Construction of 100 seated OBC Hostel (G) at Shree Ram College,Rampur, Subarnpur Feb. 24, 2024, midnight March 4, 2024, midnight
WAP/ED(IP)G/HOSTEL/ODISHA/2024/13 CONSTRUCTION OF 100 SEATED OBC HOSTEL (G) AT KISHORENAGAR PLUS THREE COLLEGE , KISHORENAGAR , ANUGUL DISTRICT Feb. 24, 2024, midnight March 4, 2024, midnight
WAP/ED(IP)/G/HOSTEL/ODISHA/2024/5 Construction of 100 seated OBC Hostel (G) at Meghasana College, Nudadiha, Mayurbhanja Feb. 24, 2024, midnight March 4, 2024, midnight
WAP/CMU-III/SSB/GT/2024/48 Selection of Agency for Geotechnical Investigations for “Construction and Development of Infrastructure Works at Bn HQRs Siddarthnagar (UP), Bn HQRs Sitamarhi-II (Bihar), Bn HQRs Araria (Bihar), Bn HQRs Thakurganj (Bihar) and Bn HQRs Tawang-II (Arunachal Pradesh” Feb. 22, 2024, midnight March 7, 2024, midnight
WAP/ENVT/GNFSU/2023-24/02 Construction for gujarat natural farming science university, at Jambudi village, taluka halol, panchmahal district (girls hostel, Kitchen & dinning hall, guest house, e-2 type quarters, b-type Quarters, d-type quarters, b-b1 type quarters, sanitataion work, Compound wall) Feb. 17, 2024, midnight Feb. 28, 2024, midnight
WAP/INFRA/KERALA/23/TVLA/464-3 Strengthening of Labour Room as per LaQshya Standards at THQH Thiruvalla, Pathanamthitta District Feb. 12, 2024, midnight Feb. 17, 2024, midnight
WAP/INFRA/KERALA/23/TRUR/455-7 Construction of Microbiology Lab at DH Tirur, Malappuram District. Feb. 9, 2024, midnight Feb. 16, 2024, midnight
WAP/INFRA/KERALA/23/TLRY/474-1 Renovation Work for the Park Office & SDF Building and other Allied Works at KINFRA Small Industries Park, Thalassery Feb. 9, 2024, midnight Feb. 16, 2024, midnight
WAP/CMU-II/2023-24/IIT(ISM)/Kitchen Equipment/39 Supply, Installation, Testing and Commissioning of Kitchen Equipment, Ventilation System, LPG Gas bank Pipe line, Waste Management System and other ancillary works of Jasper hostel, Amber hostel and 1000 Room (2000 Seater) Boys hostel at IIT (ISM) Dhanbad. Feb. 8, 2024, midnight Feb. 15, 2024, midnight
GEM/2024/B/4593996 Measurement of discharge of various drains out falling in River Yamuna directly and all sub drains out falling in Najafgarh and Supplementary drains Feb. 8, 2024, midnight Feb. 29, 2024, midnight
WAP/ED (IP)/PwD/H/ODISHA/2024/1 Construction of PwD Hostel in Utkal University, Bhubaneswar and Ravenshaw University, Cuttack, Odisha Feb. 7, 2024, midnight Feb. 16, 2024, midnight
WAP/INFRA/KERALA/24/MALO/477-1 Strengthening Works at PHC Maloor, Kannur District Feb. 6, 2024, midnight Feb. 14, 2024, midnight
WAP/POW/NIT/NEPAL/ADB/FS/GeoTech/2024/01 Notice invitation for an Agency to carry out Geotechnical investigations along the transmission line routes and associated Substations in Nepal. Feb. 2, 2024, midnight March 20, 2024, midnight
WAP/CMU-III/2023-24/SMFPL/Agartala/46 Survey, Investigation, Planning, Desiging and Construction of National Industrial Township at Agartala, Tripura on EPC Mode- I Feb. 1, 2024, midnight Nov. 15, 2024, midnight
WAP/CMU-I/2023-24/NESTS/JH/BOLBA/35 Construction of Eklavya Model Residential School at Bolba, District Simdega, Jharkhand Jan. 30, 2024, midnight Feb. 5, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/PENDRA/44 Construction of Eklavya Model Residential School at Pendra, District Gaurella-Pendra-Marwahi, Chhattisgarh Jan. 25, 2024, midnight Feb. 8, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/PRATAPPUR/43 Construction of Eklavya Model Residential School at Pratappur, District Surajpur, Chhattisgarh Jan. 25, 2024, midnight Feb. 8, 2024, midnight
WAP/INFRA/KERALA/23/MNDM/473-1 Strengthening Works at PHC Mangattidam, Kannur District. Jan. 23, 2024, midnight Jan. 29, 2024, midnight
WAP/INFRA/KERALA/23/PDYR/472-1 Strengthening Works at PHC Padiyoor, Kannur District. Jan. 23, 2024, midnight Jan. 29, 2024, midnight
WAP/INFRA/KERALA/2024/IKKI/476 Construction of TB Centre Building with District Store for TB Drugs, Idukki District. Jan. 23, 2024, midnight Oct. 10, 2024, midnight
WAP/ INFRA./NK/RMC(P8)/2023 Package 8 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 75.39 to 82.32 km under North Koel Reservoir Project, Jharkhand and Bihar Jan. 17, 2024, midnight Feb. 6, 2024, midnight
WAP/ INFRA./NK/RMC(P7)/2023 Package 7 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 68.37 to 75.39 km under North Koel Reservoir Project, Jharkhand and Bihar Jan. 17, 2024, midnight Aug. 1, 2024, midnight
WAP/ INFRA./NK/RMC(P10)/2023 Package 10 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 90.02 to 96.53 km under North Koel Reservoir Project, Jharkhand and Bihar Jan. 17, 2024, midnight Feb. 6, 2024, midnight
WAP/ INFRA./NK/RMC(P11)/2023 Package 11 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 96.53 to 109.09 km under North Koel Reservoir Project, Jharkhand and Bihar Jan. 17, 2024, midnight March 12, 2024, midnight
WAP/ INFRA./NK/RMC(P9)/2023 Package 9 - Lining, Repair & Construction of Right Main Canal and its Structures from RD 82.32 to 90.02 km under North Koel Reservoir Project, Jharkhand and Bihar Jan. 17, 2024, midnight Feb. 6, 2024, midnight
GEM/2024/B/4436851 Procurement of World DEM hydrologically corrected digital terrain model DSM + DTM (bundle) data for the project areas in Tirunelveli, Kanyakumari and Tenkasi Districts Jan. 5, 2024, midnight Jan. 15, 2024, midnight
GEM/2024/B/4437088 Procurement of World Dem Hydrologically Corrected Digital Terrain Model DSM + DTM (Bundle) Data for the Project areas in Pune, Thane, Ahmadnagar & Raigad Districts Jan. 5, 2024, midnight Jan. 15, 2024, midnight
WAP/INFRA/KERALA/23/VLKR/441-7 Conversion of Community Health Centres to Block Family Health Centres at Vellanikkara, Thrissur District. Jan. 4, 2024, midnight Jan. 11, 2024, midnight
WAP/INFRA/KERALA/2023/AMPR/463-4 Conversion of Community Health Centre to Block Family Health Centre at CHC Ambalappara, Palakkad District Jan. 4, 2024, midnight Jan. 11, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/DHARAMJAIGARH/41 Construction of Eklavya Model Residential School at Dharamjaigarh, District Korba, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/WADRAFNAGAR/37 Construction of Eklavya Model Residential School at Wadrafnagar, District Balrampur, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/PALI/40 Construction of Eklavya Model Residential School at Pali, District Korba, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/OUDGI/36 Construction of Eklavya Model Residential School (EMRS) Oudgi, District Surajpur at Chhattisgarh. Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/MANPUR-II/42 Construction of Eklavya Model Residential School at Manpur (Phase-II), District Rajnandgaon, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/NESTS/CHTGH/UDAYPUR/35 Construction of Eklavya Model Residential School at Udaypur, District Surguja, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/CMU-III/2023-24/ NESTS /CHTGH/DANTEWADA/39 Construction of Eklavya Model Residential School at Dantewada, District Dakshin Bastar Dantewada, Chhattisgarh Jan. 1, 2024, midnight Jan. 15, 2024, midnight
WAP/INFRA/NIA/CLW/KOCHI Short Term Tender Notice For Ht Cable Supply, Laying And Associated Work From Kerala State Electricity Board Limited (Ksebl) Supply Point To Complex Of Nia Branch Office At Kalamassery Dec. 28, 2023, midnight Jan. 3, 2024, midnight
WAP/CMU-I/2023-24/NESTS/JH/KUCHAI/33 Construction of Eklavya Model Residential School at Kuchai, District Saraikela Kharsawan, Jharkhand Dec. 23, 2023, midnight Jan. 19, 2024, midnight
WAP/INFRA/KERALA/23/THLR/469-1 Upgradation of CHC Tholur at Thrissur District Dec. 23, 2023, midnight Jan. 6, 2024, midnight
WAP/CMU-I/2023-24/NESTS/JH/BANO/31 Construction of Eklavya Model Residential School at Bano, District Simdega, Jharkhand Dec. 23, 2023, midnight Feb. 7, 2024, midnight
GEM/2023/B/4362982 Manufacturing, Supply and Installation of Furniture For 300 Bedded Hostel at SAI, NRC Sonepat Dec. 22, 2023, midnight Jan. 6, 2024, midnight
WAP/Envt./drain/2023/02 Measurement of discharge of various drains out falling in River Yamuna directly and all sub drains out falling in Najafgarh and Supplementary drains Dec. 21, 2023, midnight Jan. 1, 2024, midnight
WAP/INFRA/KERALA/2023/PDYR/472 Strengthening Works at PHC Padiyoor, Kannur District. Dec. 20, 2023, midnight Jan. 10, 2024, midnight
WAP/INFRA/KERALA/TCU/23/449-4 Development works of Ambedkar Settlement Development Project 2020-2021 in Thinkalkad Colony in Udumbanchola Grama Panchayath, Idukki District Dec. 19, 2023, midnight Jan. 1, 2024, midnight
WAP/INFRA/KERALA/MCU/23/446-8 Development works of Ambedkar Settlement Development Project 2020-2021 in Memari Colony in Upputhara Grama Panchayath, Idukki District. Dec. 19, 2023, midnight Dec. 19, 2023, midnight
WAP/INFRA/KERALA/PCV/23/448-7 Development works of Ambedkar Settlement Development Project 2020-2021 in Pattayakudi Colony at Vannappuram Grama Panchayath Idukki District Dec. 19, 2023, midnight Jan. 1, 2024, midnight
WAP/CMU-II/2023-24/IIT(ISM)/Centenary Building/35 Construction of Centenary Building (Lecture hall and Auditorium) including internal water supply, sanitary installations and electrical works; Storm Water Drains, Roads, Paths, Cycle Tracks, UG Sumps, External Water Supply & Irrigation Lines, Sewerage System, Electric Sub-stations Equipments, Fire Fighting, Fire Alarm System, DG Sets, HVAC, CCTV, Access Control, EPBAX, LAN & Data Networking, UPS System, Public Address System, Audio & Visual System, Integrated BMS System i/c SCADA, MRL Lifts, Pump Sets, Solar Hot Water System, HSD Fuel Storage & Pumping System, etc. at IIT(ISM) Dhanbad. Dec. 16, 2023, midnight Jan. 6, 2024, midnight
WAP/CMU-II/2023-24/IIT(ISM)/800 EWS HOSTEL/34 Construction of G+9 Storied Building for 800 Boys EWS Hostel, Construction of S + G + 9 Storied building for 80 Units of Type IV S residences and Supply, Installation, testing and commissioning of 4 Nos. of lifts at Central Research Facility building (G+7), & Lift of Admin Block at IIT (ISM) Dhanbad, Construction of 33/11 KVA Substation, UG Water Sump with Pump Room at IIT(ISM) Nirsa Campus to facilitate the Research Activities under Collaborative Projects, and all the works including internal water supply, sanitary installations and electrical works; Storm Water Drains, Roads, Paths, Cycle Tracks, UG Sumps, External Water Supply & Irrigation Lines, Sewerage System, Electric Sub-stations Equipments, Fire Fighting, Fire Alarm System, DG Sets, HVAC, CCTV, Access Control, EPBAX, LAN & Data Networking, UPS System, Public Address System, MRL Lifts, Pump Sets, Solar Hot Water System, etc. at IIT(ISM) Dhanbad Dec. 16, 2023, midnight Jan. 6, 2024, midnight
WAP/INFRA/KERALA/23/KDVR/458-7 Conversion of Community Health Centre to Block Family Health Centre at CHC Koduvayur, Palakkad District Dec. 11, 2023, midnight Jan. 2, 2024, midnight
WAP/CH/PHIW/Campbell Bay- Geotechnical/2023/4 Carrying out Geo-Technical Investigations in the vicinity of Proposed Coast Guard Jetty in Campbell Bay, Great Nicobar Islands, Andaman and Nicobar Islands Dec. 11, 2023, midnight Jan. 12, 2024, midnight
WAP/CMU-III/2023-24/NESTS /CHTGH/PALI/31 Construction of Eklavya Model Residential School at Pali, District Korba, Chhattisgarh Dec. 11, 2023, midnight Dec. 18, 2023, midnight
WAP/ED(IP)/BHOSTEL/ODISHA/2023/1 Construction of 100 seated OBC hostels (Girls) under centrally sponsored PM-YASASVI scheme at Nigamananda Mahila Mahavidyalaya at Charichhakka, Puri Dec. 8, 2023, midnight Dec. 21, 2023, midnight
WAP/IP/OBC2/2023/01 Notice Inviting Tender for Hiring of Consultancy services for Construction of OBC Hostels sanctioned under State Sector Scheme – Package 1 Dec. 8, 2023, midnight Dec. 21, 2023, midnight
WAP/CMU-I/2023-24/ CBSE/BPL/29 Construction of CBSE Regional Office and COE Building, Bhopal Dec. 7, 2023, midnight Jan. 2, 2024, midnight
GEM/2023/B/4294290 GIS related Survey Services - KM; Agricultural; 1:1000; DGPS, Total station method; DWG, CAD format (DXF/DWG) Dec. 6, 2023, midnight Dec. 15, 2023, midnight
WAP/ENVT/ESIC/SR-ROHINI/PKG-3/2023/03 Special Repair Work-Replacement of Old and unserviceable LT Panels along with Demolition of HVAC, Boiler and Manifold building at ESIC Hospital Sec. 15, Rohini, Delhi Dec. 5, 2023, midnight Dec. 18, 2023, midnight
WAP/CMU-II/IIT(ISM) Dhanbad/Structural lab/2023/31 Construction of Structural lab (20.00mx18.00mxheight 8.5 m) with attached room (18.0mx4.0mx8.5m) and installation of EOT Crane carrying capacity of 12.00 MT including internal water supply, sanitary installations and electrical works; Storm Water Drains, Roads, Paths, External Water Supply, Fire Fighting, Fire Alarm System etc. at IIT(ISM) Dhanbad. Dec. 1, 2023, midnight Dec. 30, 2023, midnight
WAP/CMU-I/2023-24/ORGI-MSR/STATUE/27 Fabrication and Installation of Sardar Vallabhbhai Patel Statue & Allied Works for ORGI at Man Singh Road, New Delhi Nov. 23, 2023, midnight Nov. 27, 2023, midnight
WAP/CMU-III/2023-24/NIT/Silchar/23 Construction of 150 Capacity Girls Hostel no. 4A and Dining Hall at NIT Silchar on EPC Mode-I Nov. 23, 2023, midnight Dec. 12, 2023, midnight
WAP/CMU-III/2023-24/NIT/Silchar/23 Construction of 150 Capacity Girls Hostel no. 4A and Dining Hall at NIT Silchar on EPC Mode-I Nov. 23, 2023, midnight Dec. 12, 2023, midnight
WAP/CMU-I/2023-24/ORGI-MSR/ART/28 Design and Execution of Art Works of Murals on building façade of Multi Storied Office Building of ORGI Nov. 23, 2023, midnight Dec. 4, 2023, midnight
WAP/INFRA/KERALA/23/MLSR/438-6 Upgradation Works for Community Health Centres at Mullasseri, Thrissur District Nov. 22, 2023, midnight Jan. 2, 2024, midnight
WAP/INFRA/KERALA/23/VNDR/456-3 Implementation of OPD Transformation Work at TH Vandoor, Malappuram District. Nov. 17, 2023, midnight Dec. 1, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/7 Maintenance of Estate – Gardening & Arboriculture in CSEZ, Kakkanad Nov. 10, 2023, midnight Nov. 23, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/11 Operation & Maintenance of Solid Waste Management Facility at CSEZ, Kakkanad Nov. 10, 2023, midnight Nov. 23, 2023, midnight
WAP/INFRA/KERALA/2023/ANCL/468 Conversion of CHC to Block Family Health Centre, Anchal, Kollam District Nov. 10, 2023, midnight Nov. 30, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/10 Operation & Maintenance of 2.25 MLD Water Treatment Plant and Distribution System at CSEZ, Kakkanad Nov. 10, 2023, midnight Nov. 23, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/9 Maintenance of Estate – House Keeping Services at CSEZ Administrative Office, Kakkanad Nov. 10, 2023, midnight Nov. 23, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/8 Maintenance of Estate – Lift, Fire fighting and Weighbridge in CSEZ, Kakkanad Nov. 10, 2023, midnight Nov. 23, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/6 Maintenance of Estate – General Cleaning in CSEZ, Kakkanad Nov. 10, 2023, midnight Dec. 23, 2023, midnight
WAP/ENVT/H-3082/CSEZA/2023-24/5 Supply, Installation and Commissioning of Online Continuous Effluent Monitoring System for CETP at Cochin Special Economic Zone at Kakkanad including AMC for 4 years Nov. 10, 2023, midnight Dec. 23, 2023, midnight
WAP/PROJECTS/GNR/SURVEY-URB/2023/01 Carrying Out Topographical Survey Work For Und River Basin, Jamanagar. Oct. 27, 2023, midnight Nov. 9, 2023, midnight
WAP/ENVT/NICSI/SR-C&E/2023/01 Special Repair- Civil Work, Electrical work, Plumbing, Sanitary Installation, Fire Fighting & Fire Safety System at NICSI, Bhikaji Cama Place New Delhi Oct. 25, 2023, midnight Nov. 8, 2023, midnight
WAP/INFRA/KERALA/23/TDRM/466-1 Relocation of Departments and Office at GH Trivandrum District Oct. 13, 2023, midnight Oct. 20, 2023, midnight
GEM/2023/B/4070705 Manufacturing, Supply and Installation of Furniture for 300 Bedded Hostel at SAI, ASI, Pune Oct. 11, 2023, midnight Nov. 6, 2023, midnight
WAP/D&RE(KOL)/WBSEDCL/TEESTA INT HEP/DRILLING/2023-24/417 Geological Investigation (Exploratory Core Drilling) for Teesta Intermediate H.E. Project (90 MW), Dist. – Kalimpong, West Bengal. Oct. 10, 2023, midnight Jan. 22, 2024, midnight
WAP/BHOSTEL/ODISHA/2023/1 Construction of 100 seated OBC hostels (Boys) under centrally sponsored PM-YASASVI scheme at Baripada, Mayurbhanj Oct. 9, 2023, midnight Oct. 21, 2023, midnight
WAP/ED(IP)/GHOSTEL/ODISHA/2023/3 Construction of 150 seated OBC hostels (Girls) under centrally sponsored PM-YASASVI scheme at Kuchinda, Sambalpur Oct. 9, 2023, midnight Oct. 21, 2023, midnight
WAP/CMU-II/NIA/2023/24 Construction / Establishment Works of Second Floor Modular OT At National Institute Of Ayurveda, Jaipur Oct. 5, 2023, midnight Nov. 6, 2023, midnight
WAP/ENVT/CMLRE/2023/01 Furnishing of Referral Centre at CMLRE, Ernakulam District, Kerala Oct. 5, 2023, midnight Oct. 18, 2023, midnight
WAP/Hydro/Owk/2023/516 Hydrographic Survey At Existing Owk Reservoir for Owk Pumped Storage Project at OWK in Kurnool District, Andhra Pradesh. Sept. 29, 2023, midnight Oct. 20, 2023, midnight
GEM/2023/B/3976342 Supply and Installation of Furniture for 300 Bedded Hostel at SAI, STC Aurangabad Sept. 19, 2023, midnight Oct. 7, 2023, midnight
WAP/INFRA/MANIPUR/2023/09-01 Construction of Multi-Facility Centre at IGNTU-RCM, Kangpokpi District, Manipur Sept. 5, 2023, midnight Sept. 26, 2023, midnight
WAP/INFRA/ASSAM/2023/09-02 Construction of New Academic Building in Assam Women’s University, Jorhat, Assam Sept. 5, 2023, midnight Sept. 26, 2023, midnight
WAP/CMU-II/NIA/Jaipur/2023/21 1. Lift Works, Recladding Works at Nia, Jaipur 2. Water Supply Works at Nia, Jaipur 3. Construction of Boundary Wall, Entrance Gate & Guard Room at Jagga Ki Baori, Jaipur 4. SITC of Aeration System & Pump In Pond at Jagga Ki Baori, Jaipur 5. Firefighting & Lift Works at Satellite Hospital, Jawahar Nagar, Jaipur Aug. 29, 2023, midnight Sept. 18, 2023, midnight
WAP/ENVT/NSEZ/O&M-WS & FS/2023/06 Operation and Routine Maintenance of Water Supply Lines, Tube wells, UGRS, Water Over Head Tanks and proper Water Supply within the Zone, Operation and Maintenance of Fountains installed at NSEZ Maintenance & Operation of all types of Firefighting Systems, Sector-81, Noida (Package-6) Aug. 28, 2023, midnight Sept. 16, 2023, midnight
WAP/ENVT/NSEZ/O&M-SS/2023/01 Providing Manpower for Round the Clock Security Services in NSEZ, Sector81, Noida (package-1) Aug. 28, 2023, midnight Sept. 18, 2023, midnight
WAP/ENVT/NSEZ/O&M-IT/2023/02 Deployment of Manpower in NSEZ, sector-81, Noida (Package-2) Aug. 28, 2023, midnight Sept. 18, 2023, midnight
WAP/Hydro/Owk/2023/450 Geophysical Survey works to ascertain Geological profile and Average shear wave velocity, for Owk Pumped Storage Project at OWK in Kurnool District, Andhra Pradesh Aug. 23, 2023, midnight Sept. 13, 2023, midnight
WAP/CED/Uttarakhand/Akhand/2023/01 Development of Akhand Param Dham Ghat at Haridwar including Operation and Maintenance of Six months Aug. 17, 2023, midnight Sept. 7, 2023, midnight
WAP/DRE/BALIMELA/DRILLING/2023/1186 Geotechnical Investigations (Core Drilling) for Balimela Pumped Storage Project, Malkangiri District, Odisha Aug. 16, 2023, midnight Sept. 6, 2023, midnight
WAP/CMU-I/2023-24/ NESTS/JH/JALD/16 Construction of Eklavya Model Residential School at Jaldega, District Simdega, Jharkhand Aug. 14, 2023, midnight Oct. 4, 2023, midnight
GEM/2023/B/3822496 Custom Bid for Services - Appointment of Material Testing Laboratory for testing of Material for Civil construction work under Samagra ShikshaKutch District 3rd Attempt Aug. 14, 2023, midnight Aug. 26, 2023, midnight
WAP/INFRA/KERALA/23/PRNM/459-3 Conversion of Community Health Centre to Block Family Health Centre at Perinjanam, Thrissur District Aug. 8, 2023, midnight Aug. 30, 2023, midnight
WAP/INFRA/KERALA/23/PZBD/444-4 Conversion of Community Health centre to Block Family Health Centre at Pazhambalacode, Palakkad District Aug. 8, 2023, midnight Aug. 29, 2023, midnight
WAP/INFRA/KERALA/23/PDKD/442-3 Construction of Vertical Extension of Existing Male Ward Building at Pudukkad, Thrissur District July 18, 2023, midnight Aug. 1, 2023, midnight
WAP/INFS-IV/LADAKH/RDD/2023-24/17-2PNDP Call Construction of Multipurpose Playground at Hunder, Nubra,Union Territory of Ladakh July 11, 2023, midnight Aug. 11, 2023, midnight
WAP/CMU - II/NVS/JNV/Cooch Behar/2023/21 Construction of Phase A works at Jawahar Navodaya Vidyalaya (JNV) at Tufanganj, District Cooch Behar, West Bengal (WB) July 6, 2023, midnight July 28, 2023, midnight
WAP/CMU-II/NWDA/KBLPA/JHANSI/FURNISHING/2023/19 Procurement, Supply & Installation of Furniture” for KBLPA office at Jhansi June 21, 2023, midnight July 10, 2023, midnight
WAP/INFS-IV/LADAKH/RDD/2023-24/16 Construction of Panchayat Ghar & CFC at Choskore-B, Union Territory of Ladakh May 24, 2023, midnight June 19, 2023, midnight
WAP/INFS-IV/LADAKH/RDD/2023-24/22 Construction of Ice Hockey Rink and Provision for Store and Dressing Room at Shara/Igoo May 24, 2023, midnight July 3, 2023, midnight
GEM/2023/B/3459281 Appointment of agency for carrying out Topographical Survey for Solapur Underground Sewerage Scheme (AMRUT 2.0) - Retender May 17, 2023, midnight June 2, 2023, midnight
WAP/INFS-IV/LADAKH/RDD/2022-23/10-2nd Call Construction of Water Lifting system through pipeline at Patchathang, block Khalsi, Union territory of Ladakh Jan. 11, 2023, midnight Feb. 28, 2023, midnight
WAP/INFRA./NK/BARRAGE-BUND/2022 Construction of 600m Bund from Ch. 3200 to 3800m d/s Right side of Mohammadganj Barrage under North Koel Reservoir Project, Jharkhand and Bihar Dec. 22, 2022, midnight Jan. 9, 2023, midnight
WAP/WRD/EMPANEL/AI/FSTP/TT/2022 Empanelment of Agencies for setting up of Green Thermal Faecal Sludge and Septage Treatment Plants of different capacities and O&M for 5 years across India May 9, 2022, midnight May 24, 2022, midnight